Project Scope and Capacity

How the proposed cemetery changed over time and where the current capacity statements still do not neatly reconcile.

AnalysisSource linked

Executive summary

The project has changed dramatically. In 2022 the County described 50,000 graves and a religious building at maximum buildout in 2122. In 2023 the applicant described roughly one-half acre of initial development and 100 funeral events per year. The current 2026 referral describes 1,832 graves and 60 funerals per month.

SourceJuly 21, 2022 referral

The County described 50,000 graves and a 3,000-square-foot worship building.

Open source record

SourceMarch 30, 2026 application

The current applicant narrative states about 60 funeral events per month and 50 attendees per event.

Open source record

100-year statement versus current capacity

The current application continues to say the cemetery will have enough gravesites to serve anticipated needs for the next 100 years. The current County referral, however, identifies a maximum capacity of 1,832 graves. At 60 funeral events per month, 1,832 grave sites correspond to about 2.5 years if one interment occurs per event; even the current application’s statement that a single adult grave may contain two caskets does not by itself explain a 100-year buildout. This is a reconciliation problem, not proof that every funeral equals one grave or that every grave will be filled at the stated rate.

SourceCurrent application

The current narrative states both the 100-year objective and two-casket adult-grave option.

Open source record

SourceMay 27, 2026 County referral

Planning identifies maximum capacity as 1,832 graves divided among seven blocks.

Open source record

Historical building inconsistencies

The 2022 record contains several different building descriptions: a February referral described 20,000 square feet; the July referral described 3,000 square feet; a plot map in the July packet labeled a 2,500-square-foot building; and stage drawings showed a 10,000-square-foot, 30-foot-high building with an occupancy of 1,200. These are historical inconsistencies, not current building proposals.

SourceJuly 21, 2022 TAC packet

The packet preserves the conflicting historical building descriptions and drawings.

Open source record

Whole-project question

The current draft Conditions of Approval cap the project at 1,832 graves. That reduces the risk of casually treating the former 50,000-grave concept as the current project. But it leaves a basic fork in the record: either 1,832 graves genuinely is the entire project and the continuing 100-year statement needs support, or larger future cemetery phases remain contemplated and should be clearly described in the environmental record.

SourceWork-in-progress draft Conditions of Approval

Draft project description identifies maximum capacity of 1,832 graves on the northern project area.

Open source record