Gardens of Noor Cemetery Collection
Traffic, Parking, and Regional Draw
Regional service area, funeral frequency, parking design, peak-event circulation, and the current traffic estimate.
Executive summary
The current application expressly says the cemetery is intended to serve Amador County, Sacramento County, Placer County, and surrounding areas. It estimates about 60 funeral events per month with 50 attendees per event, but its environmental-constraints table states an average increase of only 20 vehicles per day. The supplied record does not contain a dedicated traffic study explaining that figure.
SourceMarch 30, 2026 application
The applicant identifies a regional service area, 60 funerals per month, 50 attendees per event, and an average increase of 20 vehicles per day.
Parking description
The current County referral describes both driveway parking for up to 100 cars and a 64-space permanent parking lot. The current engineered plan visibly depicts the 64-space gravel lot, but the additional 100 driveway spaces are not clearly mapped as individually defined spaces. Historical drawings show the concept’s origin: parking was described alongside a 20-foot by 2,000-foot gravel road.
SourceMay 27, 2026 referral
County project description includes up to 100 driveway-parking spaces plus 64 permanent spaces.
SourceJuly 21, 2022 TAC packet
A historical drawing expressly labels parking alongside a 20-foot by 2,000-foot gravel road.
Peak conditions versus averages
An average daily traffic number can obscure the operational condition that matters most for a cemetery: a group of vehicles arriving and leaving around the same funeral. The project’s 50-attendee cap, driveway-parking concept, and emergency-access requirements make peak-event circulation more informative than a daily average alone.
Open questions
What vehicle-occupancy assumption produces 20 vehicles per day? Where are the additional 100 driveway spaces located? What clear road width remains when they are occupied? How were funeral processions, emergency access, and regional trip lengths considered?
Agency record
Public Works recognized from the outset that the cemetery would generate traffic and required commercial driveway encroachments and a traffic mitigation fee. In June 2026, Caltrans said the project as described would not impact State Route 104. Those statements are not contradictory: the local-road and on-site circulation questions are distinct from Caltrans’s state-highway review.
SourceCaltrans June 2026 comment
Caltrans reported no impact to SR-104 based on the submitted project description.