UP-26;11-2 · November 24, 2026
Environmental review issue tracker
Search all 101 project clarification and investigation requests from Appendix A. These are community requests, not verified findings or County commitments.
Tracking status
Every issue is marked “Response not in archive” because the supplied materials contain no County acknowledgment or disposition. This is not a claim that the County has failed to respond. Source basis codes refer to Appendix D in the submission, not independently verified archive records. Open source index.
101 of 101 requests
| Issue / subject | Cited basis | Requested action | Status / source |
|---|---|---|---|
| PD-01Whole undertaking / phasesProject description | P1 EIF 9–10,28; P19; P20 | Reconcile shared systems, dependencies and future development. | Response not in archivePDF p. 19 |
| PD-02Equipment / footprintProject description | P1 plans/description | Master equipment schedule and all permanent/temporary/off-site work. | Response not in archivePDF p. 19 |
| PD-03Internal consistencyProject description | P1 forms/plans | Resolve staffing, capacity, area, APN and drawing differences against originals. | Response not in archivePDF p. 19 |
| PD-04Plant status / baselineProject description | P6 finding 5; P18 | Operating history, restart status, reported pipeline leaks and repairs. | Response not in archivePDF p. 19 |
| PD-05CoolingProject description | P1 cover; EIF 5, 23 | Technology, fluids (incl. PFAS), refrigerants, equipment location. | Response not in archivePDF p. 19 |
| PD-06Existing featuresProject description | P1 EIF 2; S1.0/S1.1 | Features removed, relocated, protected or reused. | Response not in archivePDF p. 19 |
| PD-07Approvals listProject description | P1 EIF; P29 | Complete list of required permits and approvals (15124(d)). | Response not in archivePDF p. 19 |
| LU-01Parcels / rightsLand use and property | P1 consent/deed; P6 finding 2 | Full APN/lot/lease/easement crosswalk and authority map. | Response not in archivePDF p. 19 |
| LU-02CompatibilityLand use and property | P1 zoning/setting | Adopted map/policy/finding and sensitive-use compatibility review. | Response not in archivePDF p. 19 |
| LU-03Adjacent usesLand use and property | P1 S1.0; P14 D-1(a)(9) | Rancheria, casino/hotel, residences, farmland and contracts. | Response not in archivePDF p. 19 |
| HC-01Approval recordPrior approvals and compliance | P1 existing-facility reliance | Operative environmental/approval chain and approved plans. | Response not in archivePDF p. 19 |
| HC-02CompliancePrior approvals and compliance | Prior permits requested | Current condition/monitoring evidence and accountable entities. | Response not in archivePDF p. 19 |
| HC-03ConformityPrior approvals and compliance | P1 new proposal | Reasoned current-project/approved-project comparison. | Response not in archivePDF p. 19 |
| GP-01GP mitigation crosswalkGeneral Plan | P11; P12; P14 p. P-2; P15– P17 | Relied-upon programs, status and project-level application. | Response not in archivePDF p. 19 |
| GP-02Program D-1 criteriaGeneral Plan | P14 pp. P-15–P-19 | Address applicable D-1(a) criteria expressly. | Response not in archivePDF p. 19 |
| GP-03Adopted textGeneral Plan | P11; P12; P13 | Certified Attachments 1–2 to Res. 16-115 and Sept. 21, 2016 errata. | Response not in archivePDF p. 19 |
| GP-04Fiscal / public serviceGeneral Plan | P14 D-1(a)(7) | Fiscal and public-service evaluation. | Response not in archivePDF p. 19 |
| CE-01Review pathwayCEQA and review process | P1 fee worksheet; P2/P4 | Confirm status and supported CEQA framework, not billing category. | Response not in archivePDF p. 19 |
| CE-02BaselineCEQA and review process | P1 operations; P6 history | Actual conditions, source activity, field dates and rationale. | Response not in archivePDF p. 19 |
| CE-03Independent reviewCEQA and review process | P5 | Scopes, County direction/review, peer review and lawful cost recovery. | Response not in archivePDF p. 19 |
| CE-04New state lawsCEQA and review process | P31–P37 | Law-by-law trigger/date/threshold/exception analysis. | Response not in archivePDF p. 20 |
| CE-05Early consultationCEQA and review process | P29 | Responsible/trustee and expert agencies; tribes. | Response not in archivePDF p. 20 |
| CE-06Prior agreementsCEQA and review process | P29 | Disclose any agreements; confirm no commitment. | Response not in archivePDF p. 20 |
| CE-07Need / feasibilityCEQA and review process | P38–P40 | Reasons by ID where a request is declined. | Response not in archivePDF p. 20 |
| EN-01Power balanceEnergy and electricity | P1 cover/EIF27 | Gross/net and IT/total load, station service, charging and losses. | Response not in archivePDF p. 20 |
| EN-02Reliability / backupEnergy and electricity | P1 equipment | Availability, battery role, dispatch, shedding and failure scenarios. | Response not in archivePDF p. 20 |
| EN-03Grid rightsEnergy and electricity | P1 export claim | Service/import/export/interconnection and upgrade footprint. | Response not in archivePDF p. 20 |
| EN-04Energy analysisEnergy and electricity | P1; P33 | Appendix F/G analysis; Gov. Code 65909.3 estimates. | Response not in archivePDF p. 20 |
| AQ-01TurbinesAir quality | P1 EIF21,25,27 | Specifications, emissions/modes/controls and enforceable hours. | Response not in archivePDF p. 20 |
| AQ-02ExposureAir quality | P1 combined operations | Construction/operation/cumulative air and health-risk analysis as warranted. | Response not in archivePDF p. 20 |
| AQ-03Biomass fuelAir quality | P1 plant reliance | Consistent throughput/moisture/specification and dust/ash/odor accounting. | Response not in archivePDF p. 20 |
| AQ-04Construction dustAir quality | P1 EIF 21 | Dust controls; dust as contaminant pathway where warranted. | Response not in archivePDF p. 20 |
| GH-01GHG / benefitsGreenhouse gases | P1 cover | Actual-system inventory and supported lifecycle/credit assumptions. | Response not in archivePDF p. 20 |
| WR-01Total waterWater and wastewater | P1 EIF5–6,26,29 | Existing/restart/incremental/total seasonal supply- demand balance. | Response not in archivePDF p. 20 |
| WR-02Atmospheric waterWater and wastewater | P1 cover | Local yield, ratings, energy, treatment, storage and contingency. | Response not in archivePDF p. 20 |
| WR-03WastewaterWater and wastewater | P1 services; P6 findings6–9 | Sanitary/process/residuals/capacity/permit reconciliation. | Response not in archivePDF p. 20 |
| WR-04Existing wellWater and wastewater | P1 S1.1; P6 B.2 | Type, status and proposed use/protection/destruction. | Response not in archivePDF p. 20 |
| WR-05Septic / leachfieldWater and wastewater | P1; S1.0; P14 D-1(a)(5) | System capacity, combined load and avoidance. | Response not in archivePDF p. 20 |
| WR-06Statutory water informationWater and wastewater | P32; P34 | WSA and Bus. & Prof. Code 16100.4 information. | Response not in archivePDF p. 20 |
| WD-01Pond / monitoring networkWaste discharge and impoundment | P1 Ascent figure; P6; P9 | Identify pond; map monitoring features and setbacks. | Response not in archivePDF p. 20 |
| WD-02New flows to impoundmentWaste discharge and impoundment | P6; Water Code 13260 | Any new flows; material-change determination. | Response not in archivePDF p. 20 |
| WD-03Discharger / transferWaste discharge and impoundment | P6 E.7 | Current discharger/operator; transfer request. | Response not in archivePDF p. 20 |
| WD-04Compliance recordWaste discharge and impoundment | P10 | Monitoring, compliance and enforcement records. | Response not in archivePDF p. 20 |
| NV-01Combined acousticsNoise and vibration | P1 EIF23 | Representative baseline, spectra, receptor model and combined modes. | Response not in archivePDF p. 21 |
| NV-02Low-frequency / tonalNoise and vibration | P1 equipment; P3; P49; P50 | Supported frequency/tonal methods and criteria beyond dBA as warranted. | Response not in archivePDF p. 21 |
| NV-03VibrationNoise and vibration | P1 work/equipment; P11 p. 33 | Groundborne screening/analysis distinct from airborne sound. | Response not in archivePDF p. 21 |
| NV-04Acoustic verificationNoise and vibration | P1 assurances; P47; P48 | Commissioning/worst-mode tests, monitoring and correction. | Response not in archivePDF p. 21 |
| BIO-01Species/habitatBiological resources | P1 EIF29–30 | Qualified current screening, field/seasonal surveys as indicated. | Response not in archivePDF p. 21 |
| BIO-02Elderberry/beetleBiological resources | P1 EIF29; P28 | Shrub identification, habitat/potential and supported avoidance. | Response not in archivePDF p. 21 |
| BIO-03Wetlands/watersBiological resources | P1 plans/EIF29; P27 | Delineation, jurisdiction and full disturbance/hydrology overlay. | Response not in archivePDF p. 21 |
| BIO-04Indirect effectsBiological resources | P1 setting | Light/noise/dust/water/corridor effects and controls. | Response not in archivePDF p. 21 |
| BIO-05Streambed alterationBiological resources | P1 S1.1; EIF 29 | Fish and Game Code 1602 evaluation; herbicide use. | Response not in archivePDF p. 21 |
| CR-01Cultural/tribalCultural and tribal resources | P1 EIF29 | Records, actual disturbance, surveys, consultation and protected information. | Response not in archivePDF p. 21 |
| CR-02Tribal consultationCultural and tribal resources | P1 S1.0 | PRC 21080.3.1 consultation before document preparation. | Response not in archivePDF p. 21 |
| CR-03Industrial historyCultural and tribal resources | P6 finding 3 | Evaluate processing remnants as potential historical resources. | Response not in archivePDF p. 21 |
| GS-01Soils/miningGeology and mining | P1 EIF24,29–31; deed; P11 p. 27 | Geotechnical and documented workings/subsidence/fill assessment. | Response not in archivePDF p. 21 |
| GS-02FillGeology and mining | P1 EIF 24, 29 | Extent and composition of fill. | Response not in archivePDF p. 21 |
| GS-03Acid-generating potentialGeology and mining | P6 Table 1 | Test before reuse or stockpiling (hypothesis). | Response not in archivePDF p. 21 |
| GS-04Corrosivity / soil gasGeology and mining | P6 | Sulfate, corrosivity, methane and CO2. | Response not in archivePDF p. 21 |
| GS-05Historical underground workingsGeology and mining | P1 item 31; P6; P53–P55; P14 D-8, D-9 | Map workings vs. all structures; backfill/removal status; void investigation if unresolved. | Response not in archivePDF p. 21 |
| MIN-01Mineral classificationMineral resources | P22; P14 D-1(a)(13) | Classification, designation, PRC 2762(d). | Response not in archivePDF p. 21 |
| MIN-02Mineral estatesMineral resources | P1 deed/title | Holders and surface-entry rights. | Response not in archivePDF p. 21 |
| HZ-01Historical hazardsHazardous materials | P6 findings2–6 | Existing contamination investigations and full site-use reconstruction. | Response not in archivePDF p. 21 |
| HZ-02Investigation coverageHazardous materials | P6 pp.1–5; Sec. 13.2–13.3 | Inventory prior investigations and map locations/depths/analytes vs all disturbance; identify reliable conclusions and gaps. | Response not in archivePDF p. 21 |
| HZ-03Pathways / conceptual modelHazardous materials | P6 findings14,16–17,21; Sec. 13.4 | Evaluate project-created/exacerbated dust, vapor, runoff, dewatering, trench and haul pathways with receptor evidence. | Response not in archivePDF p. 22 |
| HZ-04Characterization / timingHazardous materials | Sec. 13.5/13.7; P7 | Where warranted obtain qualified sampling/QA/QC sufficient for significance/mitigation before the relevant decision; do not replace essential analysis with a generic future plan. | Response not in archivePDF p. 22 |
| HZ-05Agency / containment coordinationHazardous materials | P6 B/E; P8; Sec. 13.6 | Current WDR/MRP, release/integrity/compliance/assurance records; Water Board coordination and warranted additional oversight. | Response not in archivePDF p. 22 |
| HZ-06Operational hazardous materialsHazardous materials | P1 description | Inventory incl. coolants/PFAS; containment. | Response not in archivePDF p. 22 |
| HZ-07Building materialsHazardous materials | P1 S1.1 | ACM, lead paint, PCB surveys; NESHAP. | Response not in archivePDF p. 22 |
| HZ-08Pipeline leaksHazardous materials | P18 | Include in hazards baseline. | Response not in archivePDF p. 22 |
| HZ-09Cortese / P-14Hazardous materials | P11 p. 28; P14 | List check; apply P-14 and D-9. | Response not in archivePDF p. 22 |
| MW-01CharacterizationExcavated material and waste | P1 EIF 17, 20; P23 | Pre-disturbance characterization of waste streams. | Response not in archivePDF p. 22 |
| MW-02Earthwork quantitiesExcavated material and waste | P1 EIF 17 | Cut/fill/import/export; on-site balancing. | Response not in archivePDF p. 22 |
| MW-03Classification frameworkExcavated material and waste | P23; P24 | RCRA/California-only/DOT/acceptance distinctions. | Response not in archivePDF p. 22 |
| MW-04Management planExcavated material and waste | P41; P42 | Soil and Materials Management Plan with action levels. | Response not in archivePDF p. 22 |
| MW-05Worker protectionExcavated material and waste | 8 CCR 3203, 5192 | IIPP and, where applicable, HAZWOPER plan. | Response not in archivePDF p. 22 |
| MW-06CEQA treatmentExcavated material and waste | P7 | No substitution of disposal compliance for impact analysis. | Response not in archivePDF p. 22 |
| MW-07Destination facilitiesExcavated material and waste | P11 section 2.9.1 | Current authorization and acceptance. | Response not in archivePDF p. 22 |
| MW-08RecordsExcavated material and waste | P1 | Data, manifests, tickets; closeout reconciliation. | Response not in archivePDF p. 22 |
| HY-01FloodingHydrology and flooding | P1 description | Current map/elevation/hydraulics/equipment and access assessment. | Response not in archivePDF p. 22 |
| HY-02Drainage/gradingHydrology and flooding | P1 EIF17,22; P6 B | Cut/fill, runoff, dewatering, pond catchment and spill pathways. | Response not in archivePDF p. 22 |
| HY-03Floodplain sitingHydrology and flooding | P1 S1.0; P6; P14 D-1(a)(11) | Floodplain determination and equipment elevations. | Response not in archivePDF p. 22 |
| HY-04Construction stormwaterHydrology and flooding | P25; P26; P14 D-5 | CGP coverage, risk level, non-visible pollutant sampling. | Response not in archivePDF p. 22 |
| HY-05DewateringHydrology and flooding | P6 | Testing, treatment and disposal. | Response not in archivePDF p. 22 |
| HY-06Industrial stormwaterHydrology and flooding | P10 | IGP coverage for new facilities. | Response not in archivePDF p. 22 |
| FR-01BESS/gasFire and emergency response | P1 EIF25–26; P45; P46 | Testing, scenarios, separation/isolation and engineering safeguards. | Response not in archivePDF p. 23 |
| FR-02Response capacityFire and emergency response | P1 shared fire systems | Flow, access, evacuation, response, training and public upgrades. | Response not in archivePDF p. 23 |
| FR-03Response standardFire and emergency response | P14 P-6, D-1(a)(3); P1 EIF 26 | Applicable standard, source and site-specific capability. | Response not in archivePDF p. 23 |
| FR-04Evacuation / wildfireFire and emergency response | P11 section 3.6.1; P14 | Apply P-12 and D-10. | Response not in archivePDF p. 23 |
| FR-05Fire-water lineFire and emergency response | P1 S1.1 | Protect, relocate and test line and hydrant. | Response not in archivePDF p. 23 |
| TR-01Construction/staffingTraffic and construction | P1 EIF4,8,14 | Logistics, trips, parking, VMT and shift reconciliation. | Response not in archivePDF p. 23 |
| TR-02Roads / fuel tripsTraffic and construction | P1 connected operations | Routes, bridges, safety/cumulative/evacuation and prior duties. | Response not in archivePDF p. 23 |
| TR-03Heavy loadsTraffic and construction | P1 equipment | Coal Mine Road access and structures for deliveries. | Response not in archivePDF p. 23 |
| AE-01Visual/lightingAesthetics and lighting | P1 EIF18–19 | Sensitive views, elevations, photometrics and screening. | Response not in archivePDF p. 23 |
| UT-01Utilities/wasteUtilities and waste | P1 EIF20–22,26 | Service/extension footprints and construction/maintenance/end-of-life waste. | Response not in archivePDF p. 23 |
| UT-02Operational wasteUtilities and waste | P1 EIF 20 | E-waste, battery modules, filters, coolant. | Response not in archivePDF p. 23 |
| UT-03DecommissioningUtilities and waste | P1 | Plan and financial assurance. | Response not in archivePDF p. 23 |
| OT-01Other checklist topicsOther checklist topics | P1 setting | Supported agriculture/forestry/minerals/recreation/population screening. | Response not in archivePDF p. 23 |
| CU-01CumulativeCumulative effects | P1 EIF9–10,28 | Actual connected/future scope and resource-specific cumulative projects. | Response not in archivePDF p. 23 |
| AL-01AlternativesAlternatives | P1 proposal | If EIR: reasonable lower-impact options, no project and exclusions. | Response not in archivePDF p. 23 |
| MM-01Mitigation/responsibilityMitigation and responsibility | P1 indemnity; P6 D/E; P7 | Enforceable performance, successors, verification and lawful assurance. | Response not in archivePDF p. 23 |
No matching requests. Try another term or clear filters.