Executive summary
At a November 10, 2026 special meeting, the Amador County Board of Supervisors considered the Gardens of Noor Cemetery use-permit appeal for the Carbondale-area project (UP-22;2-3). Following testimony and deliberation, the Board voted 5–0 on a motion addressing three prerequisites for any further consideration: (1) a General Plan amendment due to the property's Mineral Resource Zone designation; (2) preparation of an Environmental Impact Report (EIR); and (3) an adequately described reasonably foreseeable full project, including anticipated future phases. Supervisor Dan Epperson made the motion; Supervisor Brian Oneto seconded it.
The Board did not grant a cemetery use permit and did not take a separate substantive vote to deny the underlying permit at this hearing. Counsel explained that the unresolved plan-designation, CEQA, and project-description issues prevented the Board from deciding the permit on the current record. This procedural distinction should not be confused with the Planning Commission's separate September 8 denial, which prompted the appeal.
Source: November 10 meeting video, counsel’s three issues · scope clarification · motion framework · 5–0 vote. See also the County’s pre-hearing staff report and notice.
What the Board decided
General Plan amendment
Counsel advised that a cemetery is incompatible with the site's Mineral Resource Zone (MRZ) designation as interpreted by the Board. If the applicant pursues the project, a General Plan amendment is required; this is distinct from ordinary residential zoning.
Environmental Impact Report
The Board required a more extensive EIR rather than relying on the proposed Mitigated Negative Declaration (MND), following discussion of evidence of potentially significant environmental effects.
What was discussed
Current proposal and earlier project plans
Planning staff summarized a 46-acre site with a present application for 1,832 graves in seven blocks, up to 60 funerals per month, no more than 50 people per event, 64 permanent parking spaces and additional driveway parking. Land-use and environmental consultant Peggy Flynn and other opponents argued that earlier proposals for approximately 50,000 sites and additional buildings should be considered in evaluating reasonably foreseeable buildout. The earlier, larger numbers are historical proposals, not the number of graves currently requested.
Planning staff overview · Historical project scope · Existing scope report.
Environmental questions presented to the Board
Public speakers and consultants raised concerns about traffic assumptions and narrow rural roads, emergency access and wildfire evacuation, water availability and fire flow, groundwater and septic impacts, drainage, oaks and special-status species, and proximity to Eagles Nest Airport. Several urged a full EIR. These were assertions and expert opinions presented at a public hearing; this report does not independently validate each quantitative claim or establish that a particular impact has occurred.
Traffic testimony · Groundwater testimony · Fire and evacuation testimony · Airport testimony.
Board questions about the environmental paperwork
During deliberation, supervisors questioned references in the CEQA material to an address on Camanche Road, the identification of nearby fire stations and routes, and a stated highway reference. Those comments concern the apparent reliability of parts of the environmental document, but the recorded discussion alone does not establish the origin of the errors or who prepared them.
Document and fire-station questions · Highway-reference discussion.
Applicant-side position and fairness
A consultant speaking on the applicant’s side argued that the use permit should be evaluated under applicable rules rather than neighborhood opposition alone. Later rebuttal acknowledged that environmental review and mitigation might be required. Another public commenter urged fair treatment of the applicant. The chair repeatedly emphasized that the hearing should stay focused on planning and environmental criteria, rather than religious identity or personal views of the proposal.
Applicant-side comments · Fair-treatment comment · Applicant-side rebuttal.
Timeline of the appeal
| Date | Recorded event | Source |
|---|---|---|
| September 8, 2026 | The Planning Commission unanimously found the proposed MND inadequate and separately denied the use permit. | Hearing, video and transcript |
| September 15, 2026 | The applicant’s appeal was received, according to the County-stamped correspondence and fee records. | Procedural record |
| November 10, 2026 | On appeal, the Board voted 5–0 on the three requirements described above; the use permit itself was not approved. | Board vote |
What the vote does not establish
The recorded motion does not approve the cemetery, supply a completed EIR, adopt a General Plan amendment, or show that an amended application has been filed. It also does not establish a final court outcome or resolve the underlying scientific disputes. Any later project proposal and formal written Board findings should be tracked separately when available.
Questions remaining
- Will the applicant submit a General Plan amendment and revised project description?
- What ultimate development scope will be included in any EIR, and how will historic future-phase plans be addressed?
- Which traffic, water, wastewater, fire-access, geology and biological issues will receive additional technical study?
- When will the County publish adopted written findings and official minutes for the November 10 vote?
Sources and editorial method
This report is based primarily on the November 10 County Board meeting video and its machine-generated captions supplied for this archive. Pre-hearing source documents are distinct from the post-hearing Board action. The report distinguishes Board actions, staff or counsel explanations, and testimony or opinion. Meeting captions are unofficial; the recording and any later signed minutes should control. See the pre-hearing staff report, agenda packet, and September 8 hearing.
Full Board video
The embedded recording starts around 57:01, when the chair introduces the hearing rules. The Gardens of Noor staff presentation begins around 1:01:16. Open the entire County recording on YouTube.
Key recording timestamps
Transcript preparation and limitations
The text below preserves the supplied machine-generated captions, regrouped into speaker turns: only the beginning of a new turn shows a time marker. A few caption segments mix two voices, so those turns are labeled as exchanges rather than inventing an individual attribution. Identified participants are labeled when clear from the recording text; uncertain name spellings are marked. The names of identifiable speakers in this public hearing are retained. The original public meeting video remains unaltered.
Caption-generated wording, grammar, and technical terms may contain errors. This is not a certified transcript. When accuracy of a specific quotation matters, consult the original video. Each speaker-turn timestamp links to the corresponding place in the source recording.
Searchable speaker-by-speaker transcript
No matching passages. Try a different keyword or filter.
Chair Patrick Crew
Heather's back. So, I'll get All right. Good morning, everyone. Sorry for the little delay, but we've got some ground rules for today's meeting that we can go over before the public hearing starts. Um, first I want to clear up what this public hearing is about and what it is not about. Pursuant to Amador County Code section 19.56.050, the board's review of the use permit application is de novo, meaning that the board is not reviewing the appropriateness of the planning commission decision, but rather considering the requested use permit itself directly according to subsection E of section 19.56.050. The board is not deciding whether to reject or uphold the planning commission's decision, but rather to take direct direct action to grant, deny, or grant such conditions
as it deems just and appropriate the requested use permit. Pursuant to that same Code, section 19.56.040, in order to grant any use permit, the finding must be that after the application of any imposed mitigation measures that the establishment, maintenance or operation of the use applied for will not under the circumstances of the particular case be detrimental to the health, safety, peace, morals, comfort and general welfare of persons residing or working in the neighborhood of such proposed use or detrimental injurious to the property improvements in the neighborhood. So this is not a rejection or reproval of the planning appeal. It's a de novo. It's a new a new way of looking at it. It's kind of a new legislative act. I didn't quite
know that myself. But so when I open this public hearing, the Mr. Wardall, you'll get your chance. When I open the public hearing, the appellant will have an opportunity to outline his appeal with no time constraint. After that, the opposition group has a CEQA consultant who has a presentation. She asked for no time constraint. This part will also allow supervisors to ask any questions they might have. Then we'll open up the public comment period comment of this hearing public comment portion. Please respect the five minute limit per person speaking. I will try to help you remember. In addition, as I mentioned in the opening, this board is not deciding the appropriateness of the planning commission's decision, but rather is tasked with taking direct action to grant, deny, or grant with such conditions as it seems just and appropriate. If you stray off this focus, I will ask you to refocus. And if you cannot, I will ask you to step away from the podium.
Last I don't want to hear any booze, cat calls, clapping, or any kind of other outburst. I intend to enforce respect for all people and their points of view. The big game rally was last week. Remember, those people were all kids. We're all adults. With that, it is 10:30 and we'll open the public hearing. The appellant have an opening time. We want to start with a staff report from the plan from the planning department. Okay.
Planning Department — Christa Rousell (caption spelling unverified)
This is Christa Rousell with the planning department. Um, introducing the item. It is an appeal of the planning commission's decision. As was stated, this is basically new consideration of the use permit application UP-22;2-3 for the Gardens of Noor Cemetery, which proposes 8 or 8 1,832 gravesides divided among seven blocks on the north end of the property. The 46 acre parcel is zoned R1A, single family residential and agriculture, and has an MRZ mineral resource zone general plan designation. The proposed improvements include driveway parking for up to 100 cars and a parking lot with 64 permanent spaces and permanent restrooms. Proposed number of funerals is 60 funerals a month with a limit of 50 attendees per event. The applicant is Mounir Kaddoura and this is located in supervisorial district 5 at 16630 Lambert Road Ione California 95640 and 857 Carbondale Road Ione, California 95642 or 95640. Um on in May of 2026, the Amador County Technical Advisory Committee did review
the application and found it complete. A second technical advisory committee meeting was held in June at which time uh the committee commit completed the CEQA initial study and prepared a recommendation to the planning commission along with draft conditions of approval um with the recommendation of a mitigated negative declaration for the project um project's environmental document. Uh on September 8th, 2026, the planning commission did have a public hearing and found that the mitigated negative declaration was not adequate to the address the project's potential environmental impacts and also denied a requested use permit for the project.
Chair Patrick Crew / Board exchange
Okay, thank you. Are we ready for the appellant? All right, gentlemen, you have anything you need want to say in opening? Not at this time. I was asking the appellant if they had an opening statement. They did their challenge of the uh planning commission decision. You would state your name and sign in please for the record. Thank you. That goes for everybody.
Isan Bulad — applicant-side consultant (caption spelling unverified)
Uh good morning. My name is Isan Bulad. I am I'm a consultant slash environmental engineer. I work for the Sacramento County uh Sanwaukee uh Unified Air Quality Management District and the Sacramento County. Could you pull a mic towards you please? And also towards you. Yeah, there you go. Is this better? Okay. Yeah, much better. Okay. and also for the Sacramento County and uh Sacramento Air Quality Management District since 1991. Uh during that time uh we had many public hearings for projects that certain you know the the residents around the project maybe they did not want certain project to be in their backyard. Um one of the We did not uh base our decision based on
someone oh I don't want this I don't like this project in my backyard because of this. So unless uh the project did not violate any of the rules and regulations uh we the board of supervisors they had no choice but to approve uh uh the project and from what I understanding from the last hearing there were a lot of it was a a lot of uh the residents they were contesting that u well I don't want the Muslim cemetery next to So is my understanding is wrong. That's not part of the conversation today. That's not part of the conversation today. It won't be. Okay. I'll make sure of that. Okay. I appreciate that. So um so unless you know my you know you know uh Mr. you know, he is meeting all the rules and the requirements for the planning and the building. Uh I don't see any
reason for not approving this uh uh use permit for the cemetery.
Chair Patrick Crew
Okay. Okay. That's all I have. All right. Thank you, sir. Chairman crew. Yes.
County counsel
Can I just briefly say the standard, please? So, um, a lot of what was raised at the planning commission and presumably will be raised here are, um, issues that people have raised with the initial study and the proposed mitigated negative declaration that were adopted or proposed for the project. Um, and what people are raising are environmental impact concerns related to the project. And and I agree with you, it's not just argument or that you don't like it. The standard uh which the board is aware is whether or not um there is substantial in evidence in the record supporting a fair argument that the project would have a significant environmental impact after mitigation measures are exhausted. So that's the standard that they will be reviewing the comments that are made today.
Chair Patrick Crew
Thank you. All right. Do we have the other SEA expert?
Wesley David Wardall — public commenter
Mr. Chairman, members of the board, and staff, uh my name is Wesley David Wardall, and uh I'm here to talk about the uh proposed uh cemetery project. We looked very hard at the initial filing. The initial filing by the applicant checked everything no on all the environmental uh assessments of of no impact and that that and the whole environmental assessment that was done by the planning department was a fairy tale. There was so many facts that were wrong, so many facts that were admitted. It was ridiculous. Our reply was 443 pages. I I know it's a lot a lot of work but uh we have subject matter experts, licensed engineers, doctor contractors and that will address all the problems. Some of the things that we talk about are standards. For example, if you look at the governor's office of planning and research, they say that if you have more than 110 vehicle trips per day, it is significant. It cannot be mitigated. and
that will kill the project. The applicant has asked for up to 400 attendees early on and then reduced it down trying to get his foot in the door. We estimate and looking at the um on the internet that realistically you're looking at about 225 people per funeral for a go-to destination funeral that this is being advertised as. And it'll have about 150 cars per funeral. Two funerals per day. 350 cars, I'm sorry. Let's see. 300 cars, which exceeds the 110 car limit. All of these things all the way through are facts. Now, I'm I'm going to go through a few things here and I'll uh introduce our team. The land use earning, you know what it is. You need to relocate this project in a commercial area. You need to put it on on a state highway. All of the big cemeteries in Amador County are all on state highways. They aren't on a secondary narrow road, one lane, asphalt pavement. Some of them the project does not fit in a rural community. You cited the government code
section and and that is critical because it does not fit for all the reasons we'll go through. incompatible land use. The the country roads, if you've been out in in our area, they're very narrow, no shoulders. What are you going to do with traffic jams and in a funeral procession when you need to get an ambulance or a fire truck in there's no fire protection water? There none. We drilled 10 wells on our property trying to find water. Five wells on the east side of Lambert Road are all dry. So when I see the county requiring us to put four producing wells in our section before we could get our airport in, we couldn't get water. We had to put in a seven mile water man. The county didn't require that for the applicant. Oh, just a letter from Billy Bob the well driller over in Cameron Park is good enough for him. Is good enough for him. So the standards of that whole environmental assessment were were highly inadequate.
You have decaying human remains that are going to be buried there. We're in the consumus aer aquifer. I cannot bury a horse or a cow on our property because it'll affect the consumus aquifer. Yet you're going to put all those bodies in the ground. oak trees. We had we paid in order to get our our runway lights, we had to do an environmental assessment. We hired I don't do anything halfass on that airport. We hired a world-renowned biologist, Dr. Patrick Collins, out of Salt Lake City. He came down and he spent a week, not a couple of hours, a week, going all over the property on 15 foot grids. We came up with five threatened species on the property documented. We found on our property three species of oak trees. None of this and the county has that report from 1999 and they have a map that's this big of the property. We have
it too, but none of that is in in the county assessment. The county biologist found one threatened species. The California Native Plant Society listed four out of the five. This, like I say, that whole thing was a joke. Uh, I'll try to finish up here. The interior roads need to be paved. And we have a fire chief that's going to talk about why. Uh, I'll let it go. The five species we have on our property are Bisbee Peak rush-rose Ione manzanita Ione buckwheat Irish Hill buckwheat and Parry's horkelia we have valley oak live oak and blue oak on my personal property and they're they're around on the airport I thank you for the opportunity to comment any questions
Chair Patrick Crew
thank your name.
Peggy Flynn — land-use and environmental consultant
Good morning, chair and board members. My name is Peggy Flynn. I'm a land use and environmental consultant speaking on behalf of the citizens who have joined in opposition to adoption of the initial study and the proposed mitigated negative declaration for use permit UP-22;2-3 the Gardens of Noor Cemetery project. I appreciate the board allowing additional time because this is not a routine project record. The question before you is not whether a cemetery can ever be appropriately located in Amador County. The question is whether this particular project on this particular 46 acre rural parcel served by this particular road network with this particular water, wastewater, fire access and drainage and groundwater setting has received the level of environmental review that CEQA requires. The answer is no. The
initial study and proposed MND do not provide substantial evidence that impacts will be less than significant. They leave major impacts unquantified, unsupported, deferred to later review or excluded by defining the project too narrowly. The record in instead presents substantial evidence supporting a fair argument that this project may have significant environmental impacts under CEQA. That is the point at which an environmental impact report is required. This board should therefore decline to adopt the M&D, decline to make the required use permit findings on this incomplete record and direct staff to prepare an EIR that evaluates the whole project, not simply the latest reduced version of it. I want to begin with the central problem, piecemealing. The project now before you is not a newly conceived 1832 plot cemetery on a small self-contained
piece of land. It is part of an entitlement application that has remained open on the same 46 acre Amador County parcel since 2022 under the same use permit number UP-22;2-3. The 2022 application proposed a dramatically larger development as many as 50,000 grave sites, a major assembly building described in the applicant's materials as 10,000 square feet and 30 ft high with an occupancy of,200 people as well as an office, caretaker structure, equipment building, access roads, parking, and additional facilities. The applicant's own 2022 engineering sheets did not leave the phasing issue to inference. They labeled the cemetery and internal road as stage one. They separately labeled a large assembly building and second road as stage two. That evidence matters. CEQA does not allow an agency to review the first phase while ignoring a larger documented foreseeable project of which that phase is a necessary precedent.
CEQA guidelines section 15165 directs environmental review to address the scope of the larger project where a phased project is being undertaken. This is precisely why the current project description cannot be treated as a fresh isolated proposal. The current iteration reduced the stated scope from 50,000 grave sites and a large assembly use to 1832 grave plots over 1.7 acres, but the application still covers the same 46 acre parcel. The applicant has not placed a recorded restriction on the remaining land. The earlier plans document the larger program. The applicant has reportedly stated as of September 18th of 2025 in the technical advisory committee meeting that he intended to apply for another addition in approximately 6 months and would proceed with f further proposals later. And at the June 11th, 2026 TAC meeting, future use permit amendments were repeatedly invoked as the anticipated answer to questions about the project's unlimited ultimate limits. This is not evidence
that the future is uncertain. It is evidence that future expansion is anticipated. The math reinforces the documentary record. At the applicant's stated rate of 60 funerals per month, 720 per year, the 1832 plots would be used in about two and a half years if each plot received one interment. Yet, the cemetery plan allows as many as three bodies per plot. The actual stated capacity is therefore up to 5,496 interments, not simply 1832 plots. Even taking the larger number, the project fills in approximately 7.6 years at the stated rate, and the cemetery plan describes a 100year development horizon. The present proposal thus cannot reasonably be understood as the entire long-term project on this 46 acre site. Indeed, the current density also tells the story. The proposed 1832 plots on approximately 1.7 acres produces a
density which if extended across the full parcel closely recreates the earlier 50,000 grave concept. The supposedly reduced project is not a new project with a different future. It is the first piece of the same development pattern. This is exactly the kind of segmentation CEQA is intended to prevent. The concern is not that the applicant may someday seek a lawful amendment. The concern is that the county is being asked to approve a first phase while treating the known documented foreseeable subsequent phases as though they do not exist.
Chair Patrick Crew and Supervisor Brian Oneto — exchange
Um, chairman crew, are we going to allow people to go longer than the three minutes? She gets unlimited. He gets limited. Yeah. For the first phase. Pardon? He he gets unlimited for the first phase. And then we go to public comment from the citizens will be five minutes. Okay. So the appella I gave the appella too, but he didn't want it. All right. I just want to make sure. May I continue? Sorry. That's okay. Thank you.
Peggy Flynn — land-use and environmental consultant
If the county approves this MND, later expansions may be portrayed as merely incremental changes to an already approved cemetery. CEQA requires the opposite approach. It requires the county to disclose, analyze, and mitigate the environmental consequences before it makes the commitment that facilitates that larger project. The traffic analysis is another independent reason an EIR is required. The project application identifies 60 funerals per month and up to 50 attendees per funeral. That equates to roughly two funerals per day, but it also asserts an average increase of only 20 vehicles per day. Those figures are facially incompatible. 50 attendees at a funeral cannot ordinarily be transported in 20 vehicles for an entire day if there are up to two funeral events per day. Even using a very generous average vehicle occupancy, the county's own operational cap produces approximately 40 to 50 arriving vehicles per funeral or 80 to 100 vehicle trips on a day with two
funerals. And that is before considering return trips, employees, deliveries, maintenance, visitors, or future phases. Yet, the initial study provides no actual quantified trip generation analysis. It provides no supported VMT calculation. It does not disclose total cumulative trips over the actual interment capacity and it fails to recogni to reconcile the applicant's stated event program with the applicant's much lower traffic number. A conclusion is not substantial evidence simply because it appears in an initial study. CEQA requires analysis supported by facts, calculations, and reasoned explanation. Here, the core traffic assumptions do not match the project description. More importantly, the initial study confuses a VMT question with a physical safety question. Under CEQA transportation checklist, the county must consider whether the project would substantially increase hazards due to a design feature, dangerous intersection, or incompatible use, and whether it would result in inadequate
emergency access. Those are separate questions from vehicle miles traveled. The initial study did not meaningfully analyze the physical safety questions. Instead, it relied on a generalized statement that cemeteries generate infrequent visitations for VMT purposes. That does not analyze road width, curves, sight distance, shoulders, pavement condition, funeral procession, traffic, driveway safety, emergency response, or the collision history of the actual access corridor. All project traffic must use the Carbondale Road corridor approached from State Route 16 or State Route 104 and Michigan Bar Road. The county's own regional transportation plan describes its non-state roadway network as including narrow curving sight limited roads with minimal shoulders. It identifies safety needs along SR 104 and Michigan Bar Road.
The record further identifies multiple fatal collisions within the immediate access network in recent years. We should be clear about the purpose of mentioning those tragedies. The purpose is not to exploit them. The purpose is to recognize that the safety conditions described in the county's own transportation documents are not theoretical. They are real conditions on the road. Project traffic will use a destination scale funeral use concentrates traffic at emotionally difficult moments frequently involving visitors unfamiliar with rural road geometry potentially arriving in groups following GPS navigation and traveling at particular times of the day. The M&D does not analyze that setting. The proposed mitigation does not cure the omission. It directs traffic away from certain roads and toward Carbondale Road, but the county's own public works director reportedly told the applicant that patrons will follow GPS routing. That is not a criticism of any individual. It is a realistic observation. A condition based on
posting directions has no monitoring mechanism. No vehicle counts, no enforceable performance standards, and no corrective action if attendance or traffic exceeds the assumptions underlying the M &D. The proposed MMRP contains no meaningful long-term monitoring of funeral attendance, vehicles, or cumulative interments. A mitigation measure that depends on an unmonitored operational cap is not enforcable mitigation in perpetuity. It cannot support a less than significant finding. The site's physical setting presents equally serious unstudied impacts. The initial study dismisses flooding based largely on FEMA zone X mapping, but residents have supplied testimony of reoccurring local flooding, flood related conditions, erosion, drainage failures, and roadside hazards in the immediate area. FEMA mapping is not a substitute for site-specific analysis of actual on the ground drainage conditions especially on rural land with small drainages and localized flooding patterns. The project also includes grading and site modification.
The record indicates grade changes that may be approximately 2 feet in areas of the site, but the M &D does not include a complete to-scale engineered grading and drainage plan adequate to analyze how grading will change runoff patterns, concentrate flows, increase erosion, affect nearby roadways, or interact with known flood conditions. The problem is not simply drainage. It is the interaction among drainage, shallow burial, groundwater erosion, and water quality. The applicant's own geotechnical reportedly found groundwater consistently encountered actively seeping through fractures in the underlying silt stone and pooling or ponding shortly after excavation. That is the project's own evidence of shallow fracture-fed groundwater. At the same time, the proposal involves shallow green burials reportedly as shallow as 18 in with unembalmed remains and in some descriptions without conventional casket barriers. This is not an issue to be dismissed with generalized best management practices to be developed later. The county's own council previously identified water
contamination as the most significant potential impact and requested before the application was deemed complete a detailed grave site plan hydraologic data identifying flood areas and water table depths and soil profile information for the burial areas. Those basic studies are not demonstrated in the M &D record. The county's environmental health and public health staff likewise raised concerns about groundwater contamination and pathogen leeching. Those are not community inventions. They are concerns reflected in county correspondents about this very project. The M &D must answer the question, what happens when shallow burials are located over shallow fracture-fed groundwater in an area of annual rainfall, local flooding, and potential runoff? It must analyze burial depth standards, groundwater separation, site-specific soils, hydraulic pathways, monitoring setbacks, flood exposure, and the consequences of a failure. And the M &D does none of that at the level that CEQA requires.
Feral swine is another omitted site condition. The record identifies an uncontrolled regional feral pig population and evidence of trapping activity nearby. Feral swine can root substantially deeper than the proposed 18-in burial depth and federal and state materials recognize their damage to cemeteries and burial grounds. The initial study does not even discuss the issue. It does not analyze whether the proposed 5- foot fence will exclude swine, whether it is a belowgrade barrier, whether burial depth is sufficient, or how disturbance of remains could affect public health, soil, water quality, and neighbors. A foreseeable impact cannot be avoided by saying nothing about it. Water supply, wastewater, and fire protection are also not are not shown to be feasible. The Amador Water Agency has reportedly limited the parcel to a 400gallon per day average water allocation, one equivalent dwelling unit, because the serving line is undersized and susceptible to pressure drops during high demand. The proposal contemplates
funerals, visitors, restrooms, landscape irrigation, and potential future assembly uses. The M &D has not demonstrated how those demands can be met within that allocation. The proposed supplemental well was described as producing only two gallons per minute. Yet, the project's water source remains uncertain in the application materials with references both to public water and to a new well. CEQA must analyze the actual project, not alternative descriptions that have not been reconciled. The same is true for wastewater. There is no complete engineered septic design sized to the maximum visitation and actual water demands of the proposed use. The county itself previously found the application incomplete for lack of a septic design, a verified water supply, and to-scale grading and drainage plan. Those were not trivial paperwork defects. They were the very studies necessary to determine whether impacts to groundwater, drainage, public health, and fire protection could be mitigated.
Fire access deserves particular attention. The MND defers compliance with fire and life safety requirements until after approval, but the internal access road in the site design should have been analyzed now because compliance may require additional grading, paving, tree removal, widening, structural load capacity, vertical clearance, turnarounds, and restrictions on roadside parking. California fire code access standards require adequate road width, clearance, grade, load capacity, and turnarounds. A narrow roadway cannot also function as emergency access and overflow parking. The earlier plans depicted parking along a 20 foot wide internal gravel road while the fire code requires fire access width to remain unobstructed. If fire fire code compliance requires redesign, then the M &D is not evaluating the project that would actually be constructed and there is no demonstrated fireflow supply. A limited undersized public line and an unproven low yield well do not establish adequate fire suppression water for a gathering place
in a rural high-risk fire setting. These are not details that can simply be quote conditioned after the county approves the M&D. The conditions themselves may materially change the project footprint and its effects. Deferring those fundamental feasibility questions improperly postpones environmental review until after the county has made its approval commitment. I also want to address the county's own recent appellate case, Old Golden Oaks LLC v. County of Amador. In this matter, the county successfully defended its position that it could require a developer to provide additional environmental and CEQA information before treating a grading application is complete. The court of appeal upheld the county's authority to require that rigor and the opinion remains published and citable. The county's position in Old Golden Oaks was sound. CEQA compliance is not an afterthought. An agency may require the information necessary to determine environmental consequences before advancing a project. That is the standard of care that the county should apply here. This is not a request for
special treatment or a heightened standard uniquely applied to this applicant. It is a request for consistent treatment. The county previously found this same application incomplete because it lacked a verified water supply, an engineered septic design, size to anticipated visitation, and a to-scale grading and drainage plan. Yet, the proposed MND now advances despite the continuing absence of the same foundational information. County council in this board should recognize the institutional concern. The county cannot persuasively tell a court in one case that thorough upfront environmental information is necessary before an application can proceed and then accept a materially thinner record here without explaining the different treatment. Equal application of the county's own standards protects the integrity of county decisionmaking the applicant the neighbors and the county itself. Finally, beyond CEQA, Amador County section 19.56.040
requires the board to make affirmative findings that pro proposed use will not be detrimental to the health, safety, peace, comfort, and general welfare of persons in the neighborhood and will not be injurious to property or the general welfare of the county. This is not a ministerial recital. It is a substantive finding that must be supported by evidence on this record. How can this board make that finding when traffic and emergency access have not yet been analyzed? When known roadway safety conditions have not been evaluated. When water supply, septic capacity, and fire flow remain unresolved. When site-specific flooding and groundwater impacts are deferred. When feral swine in shallow burials, the risks are emitted and when the project has been reviewed as a small first phase despite documented plans for a much larger development. The record supports only one legally sound conclusion. There is at least a fair argument that this project may cause significant
environmental impacts. If not outright denial of the project, the remedy is preparation of an EIR. An EIR would provide the public, the applicant, staff, the board, county council, and responsible agencies with the information CEQA requires before the county commits to an approval. It would evaluate the whole project and reasonable future phases, reconcile the actual project description, quantify traffic, evaluate emergency access, prepare a site-specific drainage, flood, groundwater, water quality, septic, water supply, and fire protection analysis. Address feral swine. evaluate enforcable mitigation and consider alternatives and feasible project modifications. That process is not an obstacle to good planning. It is good planning. There is also a practical reason why adequate environmental review protects the applicant, not just the county and the surrounding community.
The applicant has signed an indemnification agreement expressly covering challenges to the county CEQA determination. It requires payment of covered county defense expenses including outside counsel and litigation related staff time and covered attorney fee and cost awards against the county. An approval under this MND therefore does not end the applicant's financials exposure. It could begin a costly defense of the county's environmental review. The county meanwhile still faces the legal challenge to its decision. Indemnification allocates financial resp responsibility. It does not supply the missing environmental analysis. The board now has the November 4th Salori Missouri letter and Scott Cashin's expert assessment identifying specific biological impacts, missing baseline information, and deficient mitigation. Those issues should be addressed before approval, not left for a court to resolve afterward. A
properly prepared EIR cannot guarantee approval or prevent litigation. But undertaking the necessary review now is a more responsible path than granting an approval vulnerable to being set aside with defense expenses, delay, and further environmental review potentially following. The applicant deserves a legally supported decision as does the community. And for those reasons, I respectfully request that the board first decline to adopt the initial study and propose mitigated negative declaration. Second, find that substantial evidence supports a fair argument of potentially significant environmental impacts. Third, direct preparation of a full EIR addressing the entire responsibly foreseeable project in all connected phases. and fourth declined to make the use permit findings required by county code section 1 19.56.040 until the county has a complete legally adequate environmental record. The county should not approve first and study later. It should follow CEQA, apply
its standards consistently, protect the public record, and require an EIR. Thank
Chair Patrick Crew / meeting exchange
you. I do have one request. We have our attorney with um Salori Merve on Zoom, Mr. Michael Avenia, and I would ask uh with your permission that he go next after me. Thank you. Going to comment. No need to clap. No need to clap. Were you listening? I'm trying to accommodate everybody, but we're going to act like gentlemen and ladies. Yes, please. Thank you. Heather, have you got this fellow on? Yes. Um, Mr. Ravina, go ahead and and unmute on your end and go ahead when you're ready.
Michael Avenia — remote attorney (name spelling unverified)
Can you hear me? Yes. Okay. Thank you. Um members of the board, I appreciate the opportunity to speak today. Um without taking any position on the merits of the project as such um I just want to endorse Miss Coin's comments about the environmental issues at stake. Um I mentioned that on behalf of the Carbondale Action Group, I just wanted to reiterate succinctly things that she already covered. There's a fair argument of significant impacts on the environment from this project based upon our expert biologist's analysis of the ISMD. Um particularly impacts on oak trees because the mitigation to protect the remaining oak trees is not sufficient. Uh there is a significant potentially significant impact for spread of pathogens to Ione manzanita which is a rare plant. Um there's a potentially significant impact on wildlife movement. Um there's also a potentially significant impact to California tiger salamander.
Um these are all uh based upon the expert testimony of Mr. Cashion's review of the record which is which is attached to our letter. Um, in addition, the initial study needs to take a deeper fact-based investigation. Just more facts about the environmental conditions on site are required. And in the absence of that information, the initial study cannot lawfully satisfy the requirements of CEQA. And so we just encourage the board to conduct the the deeper environmental review that an environmental impact report would entail um to gather adequate information to support its findings. And I encourage you, you know, it's useful to take a look at our letter which is in the record. Thank you.
Chair Patrick Crew
Thank you, sir. Okay. Are we ready for public comment? We're going to start enforcing the five minute limit now. We've got the two. So, I see what we have. Come forward, please. Please state your name and sign in if you would.
Mark Kerry — civil engineer (caption spelling unverified)
My name is Mark Kerry. I'm a registered civil engineer in California. Been practicing engineering my entire career. I have a masters from California State University in environmental engineering. We have your letter. Okay. Thank you. Um so my background is focused on water and wastewater although I have spent considerable time doing drainage calculations, roadway work, doing CALR related work. So I support I think most of the argument has already been made by Peggy and also uh you can refer to my uh September 8th statements for a more lengthy discussion of my concerns. I'd like to summarize what those are given the brevity of the of the current pre uh time frame. Um again, since my emphasis on is on water and wastewater, I just state that uh we typically take a lot of time and energy helping small communities avoid impacts to groundwater when we're dealing with white both wastewater and in this case biological matter that has to decompose. I would
argue that this site is woefully inadequate from that perspective. As as previously stated, the the fact that there's no adequate aerobic zone for the waste to break down. If you look at your own environmental health standard, particularly the prior environmental health expert that you had on staff when it came to reviewing septic design and the need to break down biological matter prior to entering the water table. Typically what you do is you provide a mound in this area because it is clay and they did have a preliminary mound in this design. I would argue that it's not to the standard that even my single family dwelling was held to by your prior environmental health specialist. Basically what you need is a certain u zone of oxygenrich environment so that waste can be broken down aerobically. There's an aerobic process that takes place just like with wastewater and we have to actually get extensive permit uh processes underway. I'm undergoing one right now in Arbuckle for a new uh land application area. There has to be monitoring wells. There has to be a certain application rate that meets the loading. And I did some research on leech that they call nacraate. it it's
um it's very potentially offensive and destructive in terms of pathogenic organis organisms. Um the estimates I found in the journal water and health is some approximately a half a liter of leech per kilogram of body weight. Um I didn't do the exact math on that but it's a lot of gallons of leech um directly into the water table. And in this case, the water table is at the surface essentially out there because it's a clay soil. And the clay soil, you'd think a water table's shallow and lots of water available. It's not because it's it's largely um clay and it doesn't produce really well. But over time, it has to go somewhere. And in this case, you have bedrock 5T below a saturated clay. On that merit alone, uh I would say it fails the test of being a viable site. I mean, this is just based on facts and and known standards that your own county health officials have held us to when it comes to designing septic systems, let alone 2,000 decaying corpses. And that leech needs to go somewhere. And in this case, even as stated by the applicant's engineer, um perch storm water runoff, both surface and surf subsurface from on-site and
upper grade should be accounted for. Um and it and it was highly uh persistent and encountered in all the borings. So basically we're in the water table out there and we're putting 2,000 bodies in the water table above a bedrock layer with a with immediately downstream or downgradient and we don't know if it's exactly downgrading because there's been no fate what we call fate and transport study. Generally, u when we're dealing with contaminants in a water table, we have to look at the fate and transport of those contaminants. And in this case, not only have they not been quantified, but they haven't been uh disclosed in terms of where they're going. So, just with with those facts alone, not to mention the inadequate county roads and supporting site access with poor drainage, there's a major hazardous intersection coming onto this project. The water flows over the roadway. the roads are falling apart out there because of the saturated conditions. And then um the one thing that nobody wants to really talk about, but it's real, is the impact to our property values. This is the entry feature to our neighborhood. This is not a commercial area. This is going to affect all of our property values. The estimates are somewhere in the 12% range, um which is
significant and not mentioned at all in the documents. So in conclusion, um I would just urge you to encourage additional review before making any uh decisions that impact things and then ultimately take into consideration the discretionary nature of your approval and as witnessed by the number of people here tonight today. Um does it impact the peace, morals, and comfort of the community? And I would argue these people are the arbiters of that, not the board or the planning commission. And I would say it it is impacting that as evidenced by the people here today. So thank you for the time. Yes, sir.
Chair Patrick Crew
Next.
Curtis Holmes — public commenter
Hey chairman and board members. My name is Curtis Holmes. I'm a Eagle's Nest airport lot owner and resident. Um, I'm in opposition to this project for the numerous reasons that have been presented by others and for reasons that would be unique to my family's lot. We are located just barely west and downhill from the proposed cemetery site and it would receive the surface water and likely subsurface water runoff from the proposed site onto our lot. There's a culvert under Ram Lambert Road that routes some of the surface water runoff from the proposed cemetery site down a ditch and into our pond that's about 500 yards from the proposed cemetery site. Unlike many other ponds in our area, ours has a healthy pH balance and supports a dense ecosystem. This pond covers a land area of approximately 9 acres and is used for recreation by my family and several others in the area that routinely fish, swim, kayak, and paddle board here. Uh due to the high level of clay in this area, I believe that much of the fluid from these corpses and wastewater system would not percolate percolate downward as would be desired as these fluids would likely flow horizontal and downhill into our
pond. This fluid could potentially carry bacteria like E.coli, Salmonella, and strep. I understand that some of these pathogens can live outside of the host body for years after the death of the host. Approval of this project could potentially cause our family health issues. In addition, it would change the pristine feel of our recreation area just knowing that the water could contain these fluids from corpses and leech filled wastewater. In addition to the above concern, the location, as as Mark Kerry just has pointed out, is right at the uh cemetery site is right at the entrance to our Eagles Nest airport. Any guest or potential lot buyer would see the cemetery first when entering the airport. I don't believe that I know anyone that would want to live next to a cemetery or have it as the entry feature of their community. I believe that a large percentage um of potential Eagle's Nest buyers would not even make an offer or would dramatically reduce their offer due to this. Considering that there are 23 valuable lots within Eagle's Nest airport, the combined property value loss due to the approval of this project could easily be in the millions. The approval of the cemetery project would be a huge disservice to our community and environment and I strongly urge the board to rule against this project today and not drag this on.
Chair Patrick Crew
Thank you. Thank you sir. Good morning. Hey, good morning.
Michael Prescar — public commenter (caption spelling unverified)
Uh, thank you board for allowing me to present some issues that maybe you haven't looked at before. Your name, sir? Sure. Michael Prescar. Sign in for us if you would. I will. Sorry to interrupt you. That's all right. Um, anyway, okay, here goes. Uh, I'm going to Some of this stuff has already been said before, so I'll try to be brief. It's brief anyway. My name is Michael Prescar. live on Lambert Road in the immediate vicinity of the proposed project and would be directly impacted by its construction. I'd like to thank the board for allowing me to speak. I've done some recent research into Amador County's need for a new cemetery. The applicant proposes a cemetery for the sole use of just 1% of the US population. extrapolated to Amador County. There are roughly 400 persons qualified for burial at that site in Amador County. That is there are 40 cemeteries in Amador County. Three are very active and have plenty of space for expansion. Ione Public Cemetery has room for 100 years of expansion. They've
been recently audited and found that they have plenty of room. Um, these three cemeteries that are currently active all answered yes for a combination of green burials. And in fact, Sunset Sunset View already has plots sold to local families of the 1%. Um, they already ex there also is an existent equivalent cemetery just 21 miles west of the proposed site just off of Highway 16 and Eagles's Nest Road. Um, the applicant obviously plans this to be a destination cemetery drawing from the greater Sacramento region, northern California, and perhaps the western United States. 50,000 grave sites. He needs to fill them up. They can't come from Amador County. That's obvious. Okay. In researching low impact cemeteries, I refer you to an article named Cemeteries as a source of source of groundwater pollution. There's three issues that
stand out which would not mitigate but eliminate the use of a cemetery at this site. The number one reason, a burial or any activity related to burials must not cause pollution of surface water or groundwater. Previously, we don't we don't there's a huge surface runner uh water runoff over this property during the winter months. We've shown that by videos that have previously been shown to the planning commission. Uh number two, a burial must not be undertaken directly into groundwater. The the groundwater is at below just below the surface on this property and that can't be mitigated. Uh number three, burial density must not exceed 1,000 burials per acre. At that density, there the applicant would need 50 to 150 acres to completely build out his project. The effect of those 720 unembalmed open casket burials per year on the groundwater and aquifers is undeterminable. In summation, the destination this destination cemetery is proposed by a single non-resident of Amador County
for his own enrichment to the detriment of the local residents for local residents for all the reasons listed in county code 195640. And most importantly, this cemetery will disrupt the peace, harmony, tranquility of our quiet rural neighborhood and the quality of our daily lives and will do so for the all residents of this area and those yet to be born for the next 100 years. Further de in-depth analysis of this project is needed to asssure no harm to our fragile ecosystem or our local residents. Thank you.
Chair Patrick Crew
Thank you, sir. Good morning. Good morning, chairman and supervisors.
Jim Warful — public commenter (caption spelling unverified)
My name is uh Jim Warful, and I'd like to focus my comments today on one issue I believe deserves much more attention before this project is approved, and that's fire protection, water supply. This is not simply a cemetery in a rural area. This current proposal contemplates a facility serving as many as 60 funerals per month with up to 50 people attending each event. The county's current project description also identifies substantial parking at permanent restrooms. That means we need to ask a very basic question. If there's a major fire at this facility or a wild fire threatens this property, where's the water going to come from? The history of this area gives us a very serious warning. In the late 80s, the development in this area faced the same fundamental problem, obtaining water for domestic use and fire protection. Multiple attempts were made to drill wells in this area and according to the information available to local residents, wells in the eastern side of
the development closest to this proposed cemetery site failed to produce the water. The solution ultimately was not another well. A water pipeline had to be constructed from the Mule Creek prison area approximately 7 miles away to provide the water to this development. That history is independently supported by the state CEQA record which describes the construction of approximately 35,000 ft of water man to provide domestic water and fire protection to a new subdivision in the Carbondale area. Today we're told the water system produces approximately 490 gallons per minute and that system is already overs subscribed. So now that we compare that with the fire protection requirements we've been discussing for a 10,000 square foot commercial building, our preliminary analysis indicates that a sprinkler system would be required under the Amador fire protection district's local requirements. Even assuming that the reduced fire flow provisions available to a sprinkler building, we've been looking at approximately at 1,00 gallon per minute as a primary fireflow requirement. The existing system is reportedly capable of approximately 490 gallons per minute. That means the available water
is less than half the preliminary fireflow requirement. And that is before considering the existing customers who already depend upon that water system. So my question to the board is very simple. Where's the additional firewater going to come from? If the answer is a large storage tank, then I believe an applicant should demonstrate exactly how that tank must be, where it is located, how it will be filled, and whether the water source can reliably replenish be replenished. If the answer is a well, then I believe the applicant should demonstrate through independent testing that a well on this property can actually produce the required quality of water, which we've already seen in the past cannot. And if the answer is existing pipeline, then we need written documentation from the Amador water agency and the fire district demonstrating that the system s has sufficient capacity for this project without compromising the fire protection and water supply of the existing community.
So this is about public safety and responsible land use planning. The county's own current project materials show that Amador Fire Protection District has already identified future water requirements for buildings associated with this project. I believe those requirements need to be resolved, not deferred before this project is approved. We should not approve a project first and figure out where the fire water and domestic water will come from later. Thank you very much.
Chair Patrick Crew
Thank you, sir. Next.
Rob Woodhouse — public commenter
My name is Rob Woodhouse. Pardon me. Uh, I'm going to make this brief. Um, I've submitted a lot of this information already by letter, so you might appreciate that. Um, I believe a fair argument exists. The following special status species exist on the cemetery property and will require an EIR. These species, this isn't a Google search to find endangered species in Amador County. These species all have the exact habitat requirements that exist on that cemetery. That would be oak woodlands. That would be Ione Formation chaparral. And that would be literally across the street from open grasslands that have vernal ponds on them or vernal pools. So I'll I'll read you a list of these species very quickly. Um that would be the California tiger salamander which is federally threatened and California threatened. the white-tailed kite, which is a California
fully protected species, which means, and this was back to the 1960s, which means that has the same status as the California condor. The ringtail cat is also fully protected like the condor. The um Swainson's hawk is California threatened. The loggerhead shrike, which is a pastorine bird that is predatory and very rare. That's a species of special concern. The Blainville's horned lizard. These are the lizards that squirt blood out of their eyes. These things are a species of special concern. The western spadefoot toad is a species of special concern. The Ione manzanita of course been mentioned many times is federally threatened. Uh the Ione buckwheat is federally endangered and California endangered. Irish buckwheat is federally endangered and California endangered. The Ione horkelia is federally endangered and
California endangered. The Bisbee Peak rush-rose federally and California endangered. All of these species exist in the California natural diversity database that is maintained by the California Fish and Wildlife. Uh all of them are on the Carbondale quadrangle and the Irish Hill quadrangle. These aren't just scattered randomly around the county. So my concern is that we need a full environmental impact report with qualified biologists to protect these species. Thank you.
Chair Patrick Crew
Thank you, Ron. Next. Good morning. Good morning.
Tom McClary — airport representative (caption spelling unverified)
My name's Tom McCclary. I'm the flight safety officer for Eagles Nest airport. The uh applicant's parcel is within 1 half mile of the Eagles Nest airport runway. The initial study should have analyzed the project's proximity to the airport, particularly because the cemetery involves outdoor gatherings and the historical plans include a large assembly building. Federal Aviation Administration Regulation Part 91 stipulates that over any congested area of a city, town, settle settlement or over any open air assembly of persons. Aircraft are restricted and must maintain a minimum altitude of a thousand feet above the highest obstacle within 2,000 ft. a cemetery slashevent use that regularly gathers dozens to hundreds of people in the open for funeral graveside services. Excuse me.
Great side services and that build out a large assembly event facility create exactly such an open air assembly of persons directly adjacent to an active air strip. The application raises compatibility concerns. The education code and the public utilities code treat risk sensitive uses near runways as a distinct safety category if instructional classroom, church or assembly components are part of the project. Those questions can't be avoided by describing the current filing only as a cemetery while leaving future uses unresolved. From the airport, we fly a wide range of aircraft from smaller Cessna Viper Cub type to larger historical World War II aircraft, multi-engine aircraft as well as corporate jets. While uh estimated two or more funerals per day, I'm concerned that the folks
there uh will um possibly file numerous noise complaints being that close to our airport. CAL FIRE, Ione Fire as well as Jackson Fire Department have been to the airport and have attended staging site training in the event of an emergency or wildfire in western Abador County. I respectfully request that the board require the applicant to go through the EIR process to thoroughly address the issues that he has not addressed at this point. Thank you very much.
Chair Patrick Crew
Thank you, sir.
Dan Pippen — retired fire chief
Good morning. Uh, my name is Dan Pippen and I live in Jackson. Uh, I worked in the fire service in the US and Canada for 30 years and retired as a fire chief. I wrote articles about wildland urban interface fires, often referred to as WOOI fires, and gave presentations based on my articles at fire conferences in San Diego and Nashville. I'd like to comment on the proposed cemetery in Ione. First off, mentioned uh the uh the roads. The geotech report doesn't uh address the roads um in a very in any meaningful way. Uh and what these roads would have to have in order to accommodate fire engines would that they would be engineered to support 80,000 pounds. Fire engines and fire tenders uh and tenders can weigh that much as a weigh as much as a semi. And fire engines routinely uh respond with ambulances uh for medical calls. uh there's another issue that I think is uh critical here uh and that is about
the the risk of wildland fires and in that area and this area has a mixture of oak savannah and areas of he heavy chaparral and grass is considered a light flashy fuel in the fire service fire can spread at speeds up to 35 miles an hour if pushed by wind chaparral is considered a heavier fuel load uh capable of sustaining burning and producing embers that can create spot fires away from the main body of the fire. According to the California Fire Marshall's website, the property in question is rated high hazard with a portion rated very high hazard. The area along Carbondale Road east of the subject property is rated very high hazard. I observe brush close to the road in this area. In my opinion, if there were a fire in this area, it' be very dangerous to drive on that road in an attempt to evacuate. So, this information raised some serious life safety concerns. And in the fire service, life safety is our number one uh concern. Uh if there's a vegetation fire in the area at the time of a funeral, an evacuation was ordered, the
narrow roads could become clogged with traffic. And during evacuation, visibility can drop dramatically in a very quickly because of smoke. Then you have the risk of fires and blocking accidents. Additionally, responding units could be delay would be delayed. And if there were high winds pushing the fire, the situation could get much worse. Uh very quickly. In a worst case scenario, the fire could overrun the stop vehicles with tragic results. I want to show a short video of Carbondale Road. Do you have the short version of the Carbondale Road available? Thank you. Uh you can see that there's um I'll just start talking to make for time. Uh you can see that the there's tall chaparral vegetation on both sides of the road. chaparral is very well adapted uh to dry climates. Many varieties contain flammable oils and these oils burn very hot during wildland fires. It's almost like having diesel oil on top of your firewood. Can imagine what that would be like. Uh and Carbondale Road has chaparral
uh overhanging this road. Uh what I This is right by the the property. Uh we're coming up on the uh the other driveway uh on the Carbondale side started by Lambert. Uh there are two types of uh uh heat produced by fires. Radiant heat and convective heat. So radiant heat travels in straight lines and heat surfaces. This can cause paint to blister and plastic to melt on vehicles some distance away. It can cause air temperature in a vehicle to rise to fatal levels. even with glass intact. The other type of heat is convective heat which moves with air flow like a central heating furnace. Even a single breath of air heated above 200° causes pulmonary edema which is generally fatal. The patients lungs filled with fluid. I want to just show quickly a video of a dash cam from the other dash cam video from U Valley Fire. So, this is a a dash cam video taken by Lake County Sheriff's Office of the Valley Fire in 2015. And it gives you an
idea how quickly vision can drop. You can see he's able to see almost nothing. And this is during the day. Uh they don't have a time stamp on it, but you'll see in a minute that it comes out of it. And now you can you can see quite well. Imagine going the other way at high speed. And this particular highway is highway 29 between u Hidden Valley and Middletown. So it's a highway equivalent to highway 16. We very different than than um the uh narrow Carbondale road. It doesn't have the wide um access or wide clearance. So in my opinion, this area is not suitable for the project. That that'll be fine. Thank you. Um, and this would be true of of any project and area that would draw a large number of people. For example, a music venue, equestrian venue would not be would not be suitable for this area. So, I'd like to thank you for giving me the opportunity to comment on this project.
Chair Patrick Crew
Any questions? Thanks for the videos. All right, we've been at it an hour. Let's give the zoomers. They're waiting very patiently. So, April, you got something queued up. You said zoomers. No to speak. I don't see any at this time. Okay. Maybe they lost their patience. I thought I saw them earlier. All right. Next. We tried.
Colleen Santos — public commenter
Morning. Good morning. U. My name is Colleen Santos. I live in Ione. Uh, thank you for the opportunity to speak. We have researched and found disturbing historical facts that provide a questionable operation history for Mr. Mounir Kaddoura. More specifically, we are listing five situations that indicate substandard reasonable business practice history. Item one, 2017 and 2018 Sacramento County Consumus Community Planning Advisory Committee applicant Moner Cadura, Antioch, California project PLNP 2017-125.
Chair Patrick Crew / meeting exchange
Ma'am Ma'am, I'm going to stop you right there. Yes, sir. that is not gerine to the situation we're talking about the environmental review. So I would you could turn that into the board or I think we might have that already but I'm not going to allow that. Okay. We uh we can do that although I would think that some of this information would be pertinent to the environmental review um specifically code violations. I disagree. Okay. All right. Thank you very much. Okay. That happened quicker than I thought.
Georgiana Prescar — public commenter (caption spelling unverified)
Hi, I'm Georgiana Prescar and um good morning supervisors and all the wonderful people that have joined us today with this issue before us. My husband Michael and I live in the Carbondale area. when we moved here 10 years ago fully thinking that the existence code of 19.56.40 in existence since 1916 would protect the health, safety, peace, comfort, and general well-being of our neighborhood and us hasn't happened. For four years, the people of our neighborhood have been robbed of these things. And I intensely mean this today. We are stressed. We're stressed from morning, noon, and night. Every time we go by that neighborhood, we're stressed having to come in here today and take our time for this for four years. I'm upset. We're all upset. So, I am telling you that we have medical and physical well-being that is in danger right now for us and has been for years. Medical facts speak the truth of how a cemetery in a wrong location affects
your human body and mind. And we are a species. So I wish we could be included in the environmental report. I think it would be great. But anyway um okay. So the health of the community is at risk and indeed our lives are at risk. Anxiety is a normal phenomena but the stress associated with it can be good or bad stress. The bad stress is harmful. Strong visceral gut reaction symptoms can't be controlled. They just happen. The visceral reactions mechanism in the body triggers number one, these are a little technical terms, HPA, hypothalamus, pituitary and adrenaline release. Two, SAM, sympathetic, adrenaline, medularary spikes causing tacicardia, vasoc constriction and muscle tightness. Three, gut brain access stress hormone alters motility and increases nausea and gastric acid leading to ulcer-like
symptoms. Number four, immune pro-inflammatory cytoines, a known accelerator of atheroscerosis. All of the above contribute to coronary heart disease, endothelial damage, and accelerating plaque formation. According to Yale medicine, all of these things are backed by noted medical institutions. There, excuse me if my glasses my I've got to get my things working here at the bottom. There is a two-fold increase in heart attack in people with high chronic stress combined with depression. The heightened sympathetic activity adrenaline causes the tight chest sensation common in anxiety related panic. According to Mayo Clinic, headaches from stress related elevation of catakolamines is a well-known migraine trigger. According to Mayo Clinic, chronic worry about haunted or unhealthy surroundings keeps the respiratory center overactive and causes hyperventilation. According to Mayo Clinic, people with cemeteries that are close to them do have this issue many
times and it it is noted in the medical industry about this. And of course, there are the sleep disturbances. Elevated cortico cortisol at night inhibits melatonin release. According to Mayo Clinic, insomnia worsens both the mental health and cardiovascular strain upon human beings. These physiological changes can precipitate heart attacks. Largecale epidemiological studies link high psychosocial stress to a 2.5fold increase in heart attack incidents. According to the Mayo Clinic, chronic stress impairs immune function, making the body more susceptible to infections, inflammation, and other illnesses. Many of these reactions come on automatically as we pass by this property daily. Our neighborhood has lived with thoughts of the negative impacts of this cemetery for four years. The fightor-flight syndrome has become a norm for us now and we live daily with the thoughts of whether emergency services will reach us
in time if need be in the future. That's a huge stress. The American Heart Association and American Stro Stroke Association guidelines stress that every minute without definitive care reduces survival adds dramatically underscoring the need for unobstructive emergency routes. I myself have had a heart attack and I've been in ambulances quite a few times afterwards with perhaps a repeat one, but I got the sten so I'm okay and I'm pretty active. I know what it's like to wait for ambulances. I was also involved in a very very bad accident on the corner of Carbondale and Ione Road and I know that I was close to death and my granddaughter was also. I know what it's like to wait for these ambulances to come. These are very serious situations we're looking at out here. This is life or death in our neighborhood for many of the people that live there. All the emotional impacts make clear that the proposed cemetery has already had a negative effect on our lives. We are asking you and I am
confident that you will give us our lives back and we can live in peace for the rest of the years we have left and I hope another 20 or 30. Thank you so much for listening. Thank you.
Chair Patrick Crew / meeting exchange
Dave, you've already been up once. Let's give No, no. Five minutes in our We're through with our presentation. Okay. I'm I'm gonna let everybody else talk. You got your chance to talk. I'm the puppet master today. All right. Any other public comment? Any other people want to speak? I'll give you my No, we're not going to do that either. This is a public hearing on the CEQA analysis. Has nothing to do with feelings. And uh I just wanted to keep it that way. All right, Dave, I guess if they're going to let if nobody else has everybody said their peace.
Nope. Okay. Well, let's get through that. Give everybody a chance. Mr. Wardall asked me for a CEQA with no time constraints and he let it off which is fudging the rules.
Jamie Lubenko — District 5 supervisor-elect (name verified against County candidate list)
Uh good morning. I think it's still morning. Uh Jamie Lubenko, District 5 Supervisor Elect. Um I guess I'll start by asking a question from County Council. I want to be careful um about speaking today for or against a project um being quasi concerned that if this project ends up coming back before this board with an EIR if that would impact my ability to vote on it at that time. I think that's my answer. Depends on what you say. Okay. Um then I will just briefly say that I have received an overwhelming amount of communication directed towards me as the incoming supervisor regarding this project in opposition to the project. And I have had all of those constituents forward their concerns to the planning commission, the board, and specifically to Supervisor Oneto, who has the ability to vote today on this project. Um, and that all of those concerns that were directed towards me were in opposition to the project. I will also add to the comments that were made previously in that community that I knocked on doors during my election um
during uh the June primary. I spent a lot of time in that area and those concerns also were very real during um my conversations on the individual doorsteps of the neighborhood down there. So, I'll just leave those in the record for you. Thank you.
Chair Patrick Crew
Yes, sir.
Wayne Prince Davis — public commenter
Please sign in and say, "Sure." Wayne Prince Davis. Um I um I watched the uh hearing uh conducted by the planning commission and I wasn't here for the preamble of this meeting starting or this comment section, but I appreciate the decorum that it's been maintained here. Um, I feel like under the undercurrent is is that there's a certain animous towards the applicant and that was permitted to be displayed. I don't know if a de novo hearing alters that, but but I'm I'm just basically saying um the the gentleman deserves a fair treatment of his project and if that requires an EIR, so be it. Um there are other the other possibility if I lived in that area I'd be concerned about a plane landing on my head. I'd be concerned about planes causing wildfires. And so um you know there's why you know and and I associate people owning their own aircraft as having plenty of income to go and pay for 46 acres and take it off the market so that it's not a a hazard. I know that the the the board is not going to give advice to a a group of investors to to do something like that,
but um I appreciate that and I just feel like the gentleman should have proper concern and it seems like maybe he's going to get that today. Um when I watched the hearing and I read the appeal, rules were just kind of trampled. So that's all I have to say. All right. Thank you, sir. Anyone else who hadn't spoke yet?
Chair Patrick Crew
We'll let Mr. Wardell speak once we get through everybody.
Rod Jackson — public commenter
Good morning. Good morning. My name is Rod Jackson. I used to live right on the far side of Ione-Michigan Bar Road on the Sacramento Valley Shooting Center. And I wanted to speak about the problems with fires in the area. We did our best to keep everything cut down and cleared, but every once in a while the fire would come up and part of my job living out there was to run the water truck to try to put it out while we waited for the fire department. On the cases where it got out of hand and the fire truck wasn't enough, it got very dangerous to be anywhere near that fire. It moved fast and there is much more brush up and about in the area on the far side of the the airport over there. So, it's I have to stand behind it. It's it can be a very dangerous area and if it's not taken care of properly, it would be horrible. The other thing I'd want to
talk about is the wild hogs. I've always been a gardener and trying to put a garden out there, I had to be very particular about what I planted because there was a lot of mud. It was difficult to deal with and having wild hogs come in there and tear it up because they can find anything underground and they would tear out. Even my Jerusalem artichokes, they could tear that up faster than I could grow. So, I would really try to tell people do not put anything under there that they might want. Thank you very much. Thank you, sir.
Chair Patrick Crew
Next Good morning. Good morning. You just made it.
John Pelichi — public commenter (caption spelling unverified)
My name is John Pelichi and my question for you folks is how many chances does this applicant get? Has he Why didn't he submit an EIR as he was supposed to? He knows the specifications as well as Peggy here. And if you were the engineer working for me, I would have fired me. Thank you.
Chair Patrick Crew
All right. Any Oh, we got a zoomer. Okay, let's give the zoomers a chance. Thank you, Mr. Chairman. Uh, Miss Bennett, please go ahead when ready there. Uh, can you hear me now? Yes. Now, we got you.
Diane Bennett — remote commenter
Okay. Diane Bennett, Amador County resident from Fiddletown. I think everybody else pretty much stated it. this reszoning is not in the best interest of the community there. And if this gets reszoned, it could open up our county to all sorts of possibilities of lawsuits of other um per permits that were denied. And I really just think that we already have the capacity for these burials at other cemeteries and we need to look at that. And I could say a lot more, but it's already been said. So, I don't want to waste your time. Thank you for your time.
Chair Patrick Crew
All right. Any other zoomers since we're up there? No. Not at this time. Okay. Next. Frank,
Frank Lashinsky — Volcano Communications Group (caption spelling unverified)
Mr. Chairman, members of the board, um my name is Frank Lashinsky. I represent Volcano Communications Group. Uh I also um have some concerns over this uh because I even though I'm a Calaveras County resident, I spend the majority of my life here in Amador County and uh I love this county. It's wonderful. So um being a utility uh we deal with CEQA issues on a regular basis and we deal with EIR uh reports on a fairly regular basis as well and we understand that they're a bit laborious at times but they're necessary and we feel that they have value and hence we comply. I respectfully ask the board to consider uh the CEQA transitions and also uh possible EIR for this project. Thank you. One question, Mr. Lashinski. Yes, sir. You were speaking as an individual. Is that correct?
No, I'm speaking on behalf of the company. You got me. Yeah. Thank you for that. Is that acceptable, sir? Well, I don't care. No, I uh I spoke to the owner and she said that I could um Okay. speak on the company's behalf. Thank you. Thank you. Next.
Chair Patrick Crew
Sign in if you would and state your name, sir.
Thomas McCaffrey — public commenter
Yes. My name is Thomas McCaffrey and uh I can't do two things at once now. So, let me write this first. There's no hurry. Your time doesn't even start yet. You know, I think I asked this question the last time I was here and we have a a false or a or inaccurate and false report turned in by the person wanting to do this. Then we have a bunch of people, qualified people, debunk everything on that report. Now, how does this pass when that happens? I'm kind of hearing that you guys have the authority to pass that even though everything has been debunked. Am I am I right in thinking that there's some kind of power that you guys have that debunks the debunkers? And I'm I'm just really curious how does that happen? Can you answer that? Well, there is a de novo our hearing was a de novo hearing that we're hearing all the evidence for the first time in person by ourselves and we can grant or deny. I mean all the options are on the table. So,
okay. So, so the the last hearing all the debunking went down and you guys don't have that information that this has to be repeated. No, you do have access to that information. We have the minutes. Yeah, thanks. That's what I was wondering. We all got the proper I was just wondering who do we look for? Yeah, this is passed. Okay, thank you. Dumps. Did I answer that? Yeah. Okay, I think so.
Chair Patrick Crew
Okay, thank you, sir. Next
Public commenter — name unclear in captions
Rock Sonetto, resident of Amador County. I thank the board for allowing us this time. One of the questions I have, I heard some numbers thrown out there about plots with an S. Is that collectively the whole cemetery or is that I think the eight number is 1,800. Is that 1,800 bodies buried or is that 1,800 plots with an S? Because I know there's some plots that have 27 bodies buried. And the second is when you have a funeral procession, if they say there's only going to be I think the numbers 60 to 100 cars, who's going to be the bad person that says 101 can't go? And has there been any letters or any representation here by the CHP or the sheriff's office making any statement on this? And I agree with what pretty much everybody else has said. I think this is an illconceived project. Thank you.
Chair Patrick Crew / Board exchange
I don't want to get too far about the plots. It's uh I think you put three in each depending on uh the size of the individual and stuff. Yeah, there's a bunch of other things there, but it could be up to five, I think, if you look at the math. Next, everybody said their peace.
Virginia Manor — public commenter (caption spelling unverified)
Virginia Manor, resident of Amador County. Morning. Um, afternoon. Piggybacking on the last um, gentlemen. I'd like to know where code enforcement would even come in on this. If there were numerous complaints, have they been even discussed in any of this? I went to the planning commission meeting, but I'm concerned about code enforcement. We all face that on numerous different issues. Asking the question that's all since we're talking about departments that could be affected. Well, it's it's like noise complaints or anything else. Code enforcement can't be outed everywhere, but we default a lot of that to like the sheriff's department or, you know, that portion. So they it becomes a group effort and so the county would have full authority on this property for all services but around it whether it's law enforcement, code enforcement, sanitation services, all of that. Has that been submitted in writing by the applicant?
Well, that would be the code enforcement portion. Just like you build a house and you do something wrong, you know, you do after the fact. After the fact, after the fact sometimes isn't okay. So, thank you.
Chair Patrick Crew
Anyone else? If not, we'll let Mr. Wardall have his finish. We're going to close the public hearing after this unless Mr. Wardall invites a bunch of new questions.
Wesley David Wardall — brief follow-up
Thank you, Wesley David Wardall, resident uh of Western Amador County. I want to thank the board and uh staff very much. Uh it's been four and a half years for us uh in a lot of problems. Just one one big correction. The applicant has no access to fire protection water. The pipeline has fire protection water for our residents. Each residence because of the size of the parcels has at least a 3-in there's here 3 in or 4 in depending on when the house was built of a pipeline and morph hydrant at every house and hanger. This resident, this applicant has no access to any fire protection water. He has a 5/8 inch water meter and that's it. That's all he has. he can never access or put in a larger water meter for that uh fire protection water. The letters are in the file from the Amador Water Agency and there would be one hell of a lawsuit from our owners association going after the water agency if they ever went larger than a 58 water meter. Thank you.
Chair Patrick Crew / Board exchange
All right. Any other new information? Any other zoomers? Not at this time. Seeing none hearing none, I would entertain a motion to close the public hearing. So move. Second. All right. We had a motion by Supervisor O'N Supervisor Brown to close the public hearing. All in favor signify by saying I. I. I. Opposed. Motion carries. 5.
County counsel / Chair exchange
Now it comes back to the board. So that de novo hearing is over, Craig. And you want to review what we can do now? Well, I just want to suggest that you allow one more opportunity for any rebuttal from the appellant. Sure. Yeah. If they have any Thank you. Yeah.
Isan Bulad — applicant-side rebuttal
Um, thank you very much for the time. Um I agree with some of you know the one of the gentlemen who mentioned that you should give the applicant the opportunity and uh to go through the CEQA if that is required and uh I'm not sure if the county uh has done a CEQA for this project or not but as a lead agency I mean if this is required by the county rules regulations then they may maybe maybe they need to look into that and if there is any mitigation that they find he would be required to do it. Okay. Yeah. Is that all? Yeah, that's it. Okay. Thank you. All right.
Board / counsel exchange (multiple voices)
So, so to clarify, the CEQA review would not be on us. It'd be on the appellant. Well, so a couple things. That's what I wanted.
County counsel — procedural guidance
Yeah. The the first thing which was in a staff report that went out to the supervisors yesterday raised the general plan interpretation question. The board should um at least as part of the decision if not first uh make a determination whether a cemetery is a permissible use in a mineral resource zone general plan designation. Um and then a second major issue would be to decide about the adequacy of the initial study and the proposed mitigated negative declaration. If you feel that those the standard has been met about the fair argument based on substantial evidence of a significant uh impact from this project then you're required to requ to to have a EIR produced. Um so that would be a second element. And then the third main issue that I think has brought up brought been brought up is um relative to the project that's being described um whether or not it's whether or not the proposed 1,800 roughly uh sites is
the the whole project the reasonably foreseeable project. That's what needs to be evaluated. So, um it doesn't necessarily have to be decided by the board, but if you feel like based on the evidence that the 1,800 um currently proposed project is un is not the the full reasonably foreseeable project, then then it's that reasonably foreseeable project that needs to be analyzed. So, those sort of three things. They might need a general plan amendment based on your interpretation. uh they may need to do an EIR based on your decisions and they may need to revise the project description. Those are the I think main things. If if you answered all those in the affirmative, you could not make a ruling on the on the underlying general plan I mean u the underlying um use permit request because you wouldn't have an adequate record to make that decision. That's kind of what from my perspective what I think is before the board right now.
Board member — question
A number of times has referenced that this is a single family piece of property. Is that preclude other business activities there? I mentioned a number of times throughout the discussion.
County counsel — land-use explanation
No. Uh cemeteries are allowed in residential zones with the use permit. So that part is okay. It's just the the general plan says it's mineral resource zone and it has compatible and incompatible uses. Um and mineral resource zone basically is an area that may be mined at some time and you cannot develop over a minable area because it would you can't mine it with stuff that can't be moved i.e. the burial plots, buildings etc. Such uses include highdensity residential and non-compatible industrial commercial or public uses.
Board / counsel exchange (multiple voices)
Right. And if it's an in Greg, if it's an incompatible use according to the G latest general plan, then the rest of it's moot, isn't it? If we find that it's in well then they'd have to we'd have to stop and they'd have to apply for a general plan amendment among Yes, they would need a general plan. They would have to Yes, that would they would need a a general plan amendment and a use permit would be required. Um, but even if and
County counsel — general plan advice
yes, that would essentially prevent you from going forward to consider the use permit today. But I would recommend that you give assuming the applicant decides to continue going forward that you give direction to them and staff about the scope of the environmental review. If you're going to require an ER, they want to know that as well. And if you going to tell them that they need to revise, you know, the foresee they they need to use the foreseeably reasonably foreseeable project, they need to know that as well. Um, but the general the the general plan designation for MRZ uh says lands having the current current mining operations or significant mineral resource deposits. This classification is intended to prevent premature conversion of these lands to other land uses and to restrict the encroachment of land uses which would preclude or seriously hamper the extraction of mineral resources. Such uses include highdensity residential and non-compatible industrial, commercial or public uses.
Compatible uses may include residential less than 0.025 025 dwelling units per acre. Industrial related to extracting, manufacturing or processing of the mineral resources, passive recreation, agricultural, silva culture, grazing and open space. So those are the compatible uses. So, if the board were to make a determination that a cemetery in this general plan designation is an incompatible use, then it just simply isn't allowed. And so, they would have to get a general plan amendment to to move forward with the proposed project on this property. So this this property is zoned in MRZ as is you know there is a approximately a thousand acre mining operation immediately adjacent to this property.
Board discussion (multiple supervisors)
Yeah. I mean it's that's pretty clear I think. I mean no subjectivity to that right. I don't think so at all. I mean, it seems pretty clear it's not it's a predive use by the very definition, barring the change in the I can't think of a use that would preclude the mining of that property more than placing something on it that is sacred for 500 years and unexavatable. It's not a word, but not to go backwards, but like I think too with like the the lead shade and the type of ground that's there. I mean, it's I mean that it's pretty compelling that it would be a real problem to be able to have buried bodies there in that quantity. I think the mineral thing is already ahead of that. So, I don't think it even comes into play. Yeah, I think there there's no question that whole Ian area at least large parts of it are min highly mineralized and has significant deposits. If you look at the mining history, it's been a major um operation down there for a lot of years, a lot of areas and one of our last economic drivers in this yeah impoverished county.
And something else I think is kind of um you know on another note I think as far as what was prepared for CEQA was has some real issues. One of them I was looking at, I think it was on um page 78 relating to geologic map um talks about 3,200 Camanche Road, I think and I don't I don't know. So that's page 78 or 43. Page 43 of the CEQA study checklist. Geological map of California, 3200 Camanche Road Ione. I don't know what that's doing in here. I don't think it's correct. And that may relate to page 91 of our packet where it talks about um addressing fire impacts. And it says a project is located approximately 2 milesi from my own fire station as well as less than a mile from command chain Jackson Valley stations and therefore will not require any increased fire protection due to this project. There is no impact. Um so I
You know, besides a mineral question, I would question if the sequ information is correct. Yeah, I I saw that too. It's actually 6.9 miles from uh the fire station to an Ione CAL FIRE. It's mentioned in there. That is not a fire station. That's a training facility. And then uh station 121 over off 16 is also 6.9 miles away, too. So that's off by an order of four, I guess. So, our SE was on a different piece of property what we have thus far.
Board discussion — CEQA document concerns
I don't know. Some of it possibly. Yeah. Yeah. I mean, I would think that probably should have been caught probably even by the county um let alone the um basically um the proponent or engineer I guess. Um, also something else, uh, if you do a if you're down there at Highway 16 Ione Road and you do a search for how to get to the project, it runs you down Maxwell Road. That's the directions it gives you. Um, well, no. So, if you go down, the problem is, I mean, there's a requirement for them to use, I think, was Lambert Road. Um, but if you're going down Maxwell Road, that's a pretty pretty narrow road. Um, and so it's you can tell you can tell people going to an event to use to go this route or that route. But I know I know what people do. I know what I do a lot of times. You say, "Okay, I'm going somewhere." And you just either speak in or tie type in where you want to go and it gives you directions. So it'd be put them down Maxwell Road.
And that's a small road. Matter of fact, I did that yesterday. I was down Liberty Road and I wanted to go to Swinging Utddters Veterary Supply and I'd never been there before. So I typed it in and I pulled into this yard, man, it looks kind of small and it's got a sign there. It says swing utters under the flag. I thought, look, the place I got into a flag and it looked like a quarter mile away and here's this flag and oh, okay, I'm at the wrong address. But I was at the right address, I guess, but wrong location. So, I see a lot of people going on Maxwell Road and it's not a good a good it's not a good road for a lot of traffic. That's a couple more things I see. But I think the big one is probably um is it a compatible use in a mineral resource zone? Um that's I think we have to answer that question first.
County counsel / Board exchange
You definitely need to answer that question. Um, but like I said, if the if the applicant is going to proceed with trying to get this project entitled, then they'll need direction on the the whether they need to do an EIR as well. Is a general amendment like a six-month thing or excuse me, is a general plan amendment? It's usually pretty laborious, isn't it? I' I'd defer to planning staff on the on the timing. um they are permitted differently than in like an entitlement like a use permit. They are legislative decisions. They standard for approval is different. We're just looking for some information here.
County staff / counsel — amendment process
Yeah. So if the applicant were to apply for a general plan amendment, it would go with this project. It would be part of it. So it would also have to be evaluated as part of the yarn and everything. and the entitlements would cover all of it. Procedurally, the use permit traditionally they would go to the planning commission and then the planning commission would have the option to approve or deny the use permit and then provide a recommendation regarding the general plan amendment to the board which and the board would have the final decision on that. In this case, because it's already before you, it would come back to the board as including the general plan amendment if that were included by the applicant.
Board / counsel exchange
Hypothetically, we decide that it needs a general plan amendment and then the applicant would have to supply that application addendum to it's all up to him incorporate with the project as proposed. Yeah. or we could just deny it. But I know you said we should.
County counsel — recommended procedure
I would I mean if the if the board is made a determination one, you need a general plan amendment and two that the environmental document didn't adequately discuss the entire record. My recommendation would be to not make a substantive decision on the project itself because I don't think um you would have the an adequate record to base it on there. There are I mean based on what I've heard and what I think the board has heard there are potentially significant impacts that might support denial of the project. Uh but I think you need an an to flesh that out potentially. the applicant would pay for that.
Board discussion — project expansion
And one other thing I'd wonder about too is originally a 50,000 um sites and I'm kind of a business guy a little bit and I'm going okay would somebody go to all this effort for 1,800 sites? I don't know if it's pencil very well. So I would think well is it are they looking at doing 1,800 sites get established and come back and say hey we're here we want to get bigger. That was stated on the record. Peggy addressed that in Yeah, that was stated on the record at the TAC meeting. Yeah, that it was going to expand from here. Yes. I mean, to the microphone, please. Thank you, Chris.
Mark — public commenter (surname not verified)
My name is Mark and I live adjacent to the airport. Um, thank you for letting me speak. One of the things you might do when you're wondering about this 1832 to be propri pre precise number when I first heard of that I thought that was a very strange number and I played around with numbers a little bit and I divided it into 55,000 and I came up with 30. And if you take those 30, you can find 30 parcels out there where you can put all that put 55,000 um burial sites. That might help you a as you try to decide whether or not there was a plan to go on later. What do you mean 30 parcels? I mean 30 uh 30 times I guess that you could
redo the 1832 numbers. That's what I was trying to say. Okay. Thank you.
Board / counsel exchange
I just it doesn't meet the MRZ whatsoever. It's actually the exact opposite of it. So there would need to be It would have to be reszoned. Um, and that would be downzoning too, wouldn't it? Which is frowned upon?
County counsel — General Plan amendment
Well, it's ultimately general plan amendments are are are legislative actions decided by the board of supervisors. So, um I I don't know what they would try to change the general plan to. Um, that's really up to them to request as part of their application. But if they were to do a general plan amendment wrapped up with a revised project, sounds like the board also is saying that it's not the 1832 currently proposed project is not not what's reasonably foreseeable and that's a piecemealing issue. So they need to they need to revise that. Um, if the if the board decides they need to do an EIR, that EIR will evaluate all of the entitlements, including the general plan amendment that they would be asking for. I mean, like and it would touch on all of these issues that are raised, they would do scoping, and if there are other issues that need to be addressed in the
Board discussion — attendance and road access
IR, they would they all get evaluated. I mean, if it was even look going forward, you'd almost have to have more information and flush it out because there there's some questions there. Pretty serious ones. Very good question. Well, I mean, the traffic alone is I don't know where 50 comes from. I've attended plenty of funerals and I can tell you I've unpredictable number. I don't know how you if you have a weddings, you can just say, "Well, we're cutting off at 50 invitees. That's kind of it plus staff and whatever else." But a funeral, I mean, it's pot luck. I mean, you may have two people, you may have 200, and there's I don't know how you I don't know how you control that. Um, it would not be very fair to the community to have these giant, you know, processions going through, which I mean, we don't want to, you know, you don't we don't want to hinder the mourning either. I think it'd be unfair to the families that are mourning the loss of a loved one to put a restriction on. I don't even know how you do that. I've never heard that. It's pretty exotic. along that same line are same line. If you look at modern recent cemeteries that were permitted, they're all done off state highways.
Um, and there's a reason for that. I mean, I've been to some of these, you know, graveside funerals. You go to some of these cemeteries and it's kind of a war zone of parking in the small little small little roads. Um, but back then was probably probably a little bit different world. And now we're looking at what we have now. People trying to access something that's you got one off Highway 88, Amler Memorial, you got like Sunset West off Highway 88. Um there's I think there's a reason why the county permitted them in the past on a major road access. That was one of the notes on the traffic thing, too, is that the nearest state highway was 88. I'm like, well, I don't know how you come up with that. It's clearly not. It's that I don't know if that piece was copied and pasted from somewhere or what, but Jackson Highway is obviously the nearest state highway there, but I'm not sure why that was in there that way. I think it goes back up 3200 Camanche Road in my guess. That's what it sound like. Yeah, that's exactly what it sound like. I found every one of the arguments to be worthy of further investigation.
I think uh it's it looks to me like more than 50% of the people if they Googled mapped this place would be on Maxwell Road. And if the intent is to serve Northern California, you'd have just you'd have everybody on that little road, single lane road.
Chair / Board discussion — requested action
Well, I think the public and the appellant are both here today for us to make some kind of a decision, some direction they want to go. I don't I don't I don't see where we have um enough information to deny it really. Hey, let's keep it down. Thank you.
County counsel — project-description clarification
I I just want to make one comment with respect to what you're voting on today. The application before you is for 1832 burial plots over 1.7 acres of a 46 acre parcel. There's been a lot of discussion about what piecemealing is under CEQA law. If that is an incorrect project description, that is a deniable project description for the project at hand. It would then be up to the applicant to modify that project description to encompass the whole of the action, which is how will the remaining 45 acres be developed?
Board / counsel exchange
Got look at it from a buildout standpoint. it it's not the same thing. You're you're not going to take any action on the use permit. It won't be there won't be an there's no use permit before you because the project description is inadequate. You're sending it back because the because the environmental documents also inadequate and they need a general plan amendment. There's no use permit that even reaches you because you've already made these other decisions that negate the use permit ever reaching a point of making a decision. We don't have a So, it is effectively it is effectively denied because you cannot approve it. You simply can't approve it because of the other decisions that it sounds like you're making. Yeah. Starting with the General Bland amendment. Yeah. So, do we need to make a motion to to uh go for the general plan amendment then? Is that what it would be?
I would I would You all had your chance to talk. Again, there's no permit to deny. That's what he's saying. There's no You can't There's nothing to deny. That's There's a legal process we have to go through.
County counsel — three-part motion framework
Yeah. I would wrap it all together in one motion. Okay. One, you can't address the use permit because they need a general plan amendment. Two, they need to do an EIR based on the evidence in the record. And three, if it comes back, it needs to properly describe the reasonably foreseeable project. Those those three things.
Supervisor Dan Epperson — motion
And it'd be nice if the EI was on the appropriate or the correct piece of property. So moved.
Supervisor Brian Oneto — second
All right, we have a second. I'll second that.
Chair Patrick Crew — final vote procedure
All right. We had a motion by Supervisor Epperson. You want to go through it one more time with all the background noise? No, I'll I'll uh leave the our our council's comments intact. Okay. And we had a second by Supervisor Oneto. Any other public comment before we take a vote? Please come to the podium. Seeing none, hearing none, we'll call for the question. All in favor of the motion signify by saying I. I. I. I. Opposed. Motion carries. 5-0. And with that this meeting is
End of supplied caption export: approximately 3:03:48. The video continues to be the primary source.